Rubbish Collection. Safe Work Method Statement (SWMS)

$96.80

The Rubbish Collection. Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Rubbish Collection. Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Rubbish Collection. Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Rubbish Collection. Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Rubbish Collection. Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Rubbish Collection. Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Rubbish Collection. Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Machinery malfunction
    • improper PPE utilisation
  • 2. Route Planning
    • Traffic accidents
    • incorrect handling of equipment
  • 3. Truck Inspection
    • Inadequate maintenance
    • accidents due to defective brakes
  • 4. Loading Rubbish
    • Injury from heavy lifting
    • risk of infection from waste material
  • 5. Transportation
    • Risks involved in driving
    • accidents involving pedestrians and other vehicles
  • 6. Unloading Rubbish
    • Exposure to hazardous waste
    • physical harm from uncontrolled release of rubbish
  • 7. Waste Management
    • Exposure to infectious diseases
    • chemical burns
  • 8. Clean Up
    • Accidental injury with cleaning tools
    • slip-and-fall hazard
  • 9. Vehicle Parking
    • Accidents during parking
    • falling objects during storage
  • 10. Paperwork Completion
    • Strain injuries from prolonged sitting
    • paper cuts
  • 11. Machine Maintenance
    • Electric shock or burn injuries due to improper handling
  • 12. End of Shift Tasks
    • Improper manual handling
    • fatigue leading to errors and accidents
  • 13. Emergency Procedures
    • Inadequate knowledge leading to worsening conditions during emergencies
  • 14. Training and Skill Development
    • Injuries due to lack of training or skill
  • 15. Equipment Checks and Updates
    • Risk of outdated equipment causing accidents
    • malfunctioning gear
  • 16. Safety Awareness Programs
    • Lack of awareness leading to increased risk
  • 17. Following Health and Safety Guidelines
    • Injuries due to non-adherence to safety guidelines
  • 18. Regular Audits
    • Identifying risks late or not identifying them at all
    • resulting in mishaps
  • 19. Waste Site Selection and Inspection
    • Risks from improper selection or inspection such as littering and pollution
  • 20. End of Day Procedures
    • Accidents due to fatigue and lax behavior towards end of shift

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Rubbish Collection. Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart