Rooftop Solar Installation Safe Work Method Statement (SWMS)

$96.80

The Rooftop Solar Installation Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Rooftop Solar Installation Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Rooftop Solar Installation Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Rooftop Solar Installation Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Rooftop Solar Installation Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Rooftop Solar Installation Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Rooftop Solar Installation Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • trips and falls
    • manual handling injuries
  • 2. Site Inspection
    • Uneven surfaces
    • existing site conditions
  • 3. Weather Assessment
    • High winds
    • extreme temperatures
  • 4. Access Equipment Set-up
    • Equipment failure
    • incorrect set-up
  • 5. Personal Protective Equipment
    • Incorrect use
    • equipment failure
  • 6. Electrical Lockout/Tagout
    • Unauthorized access
    • electric shock
  • 7. Loading and Unloading Materials
    • Falling objects
    • manual handling injuries
  • 8. Roof Edge Protection
    • Falls from height
    • inadequate railing
  • 9. Panel Handling
    • Manual handling injuries
    • panel damage
  • 10. Electrical Connections
    • Electric shock
    • incorrect wiring
  • 11. Mounting System Installation
    • Tool-related injuries
    • slips
    • trips on the roof
  • 12. Cable Management
    • Tripping hazards
    • cable damage
  • 13. Inverter Installation
    • Electric shock
    • incorrect installation
  • 14. Testing and Commissioning
    • Electric shock
    • equipment malfunction
  • 15. Clean Up and Debris Removal
    • Slips
    • trips and falls
    • unremoved construction debris
  • 16. Final Inspection
    • Missed faults
    • improper fixings
  • 17. Dismantling Scaffolding
    • Falls from height
    • incorrect disassembly
  • 18. Waste Disposal
    • Environmental hazards
    • improper waste handling
  • 19. Site Demobilisation
    • Vehicle movement risks
    • site condition changes
  • 20. Completion Reporting
    • Administrative errors
    • incomplete documentation
  • 21. Worker Training
    • Insufficient knowledge
    • safety procedure misunderstanding

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Rooftop Solar Installation Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart