Roof Top Duct And Vent Inspection Safe Work Method Statement (SWMS)

$96.80

The Roof Top Duct And Vent Inspection Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Roof Top Duct And Vent Inspection Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Roof Top Duct And Vent Inspection Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Roof Top Duct And Vent Inspection Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Roof Top Duct And Vent Inspection Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Roof Top Duct And Vent Inspection Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Roof Top Duct And Vent Inspection Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Unsuitable tools and equipment
    • Lack of Personal Protective Equipment (PPE)
  • 2. Site evaluation
    • Falls from height
    • Trip hazards
    • Obstructed access
  • 3. Ladder placement
    • Incorrect ladder position
    • Falls from height
  • 4. Roof access
    • Risky access to roof
    • Winds
    • Weather conditions
  • 5. Duct & vent isolation
    • Electric shock
    • Inadequate insulation
  • 6. Safety barriers setup
    • Ineffective safety measures
    • Falls from heights
  • 7. Duct & Vent inspection
    • Exposure to harmful substances
    • Cuts or lacerations
  • 8. Photographing & documenting
    • Focus distraction
    • Falls from height
    • Dropping equipment
  • 9. De-isolation of ducts & vents
    • Leakage
    • Electric shock
  • 10. Disassembly of Safety barriers
    • Falls while dismantling barricades
    • Incorrect handling
  • 11. Exiting roof
    • Slips
    • trips and falls
    • Poor weather conditions
  • 12. Ladder removal
    • Incorrect movement
    • Dropping ladder on pedestrian
  • 13. Reporting & Documentation
    • Musculoskeletal injuries due to poor ergonomics
    • Mental fatigue
  • 14. Clean up activities
    • Manual handling injuries
    • Contact with hazardous waste
  • 15. Post job brief
    • Miscommunication or misunderstandings
    • Fatigue
  • 16. Equipment maintenance
    • Equipment failure
    • electric shock
    • improper handling
  • 17. Waste disposal
    • Exposure to hazardous waste
    • Incorrect waste disposal
  • 18. Post-inspection debriefing
    • Miscommunication or misunderstandings
    • Fatigue
  • 19. Review safety protocols
    • Non-compliance to regulations and standards
    • overlooking potential hazards
  • 20. Emergency evacuation drill
    • Panic
    • Falls while rushing
    • Ignorance towards alarm

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Roof Top Duct And Vent Inspection Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart