Roof Tile Displacement Risk Safe Work Method Statement (SWMS)

$96.80

The Roof Tile Displacement Risk Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Roof Tile Displacement Risk Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Roof Tile Displacement Risk Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Roof Tile Displacement Risk Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Roof Tile Displacement Risk Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Roof Tile Displacement Risk Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Roof Tile Displacement Risk Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Exposure to weather conditions
    • Improper use of tools
  • 2. Assess worksite layout
    • Tripping hazards
    • Falling debris
  • 3. Set up safety equipment
    • Defective safety gear
    • Inadequate training
  • 4. Inspect condition of roof tiles
    • Breaking tiles
    • Slipping and falling
  • 5. Remove defective tiles
    • Lacerations from sharp edges
    • Falling from height
  • 6. Clean work area
    • Rubble causing tripping hazards
    • Dust inhalation
  • 7. Install new roof tiles
    • Falling from height
    • Tiles breaking under weight
  • 8. Secure freshly laid tiles
    • Tiles slipping
    • Incorrect application
  • 9. Perform quality check
    • Poorly installed tiles
    • Unseen defects
  • 10. Dismantle safety setup
    • Improper handling of equipment
    • Hastiness resulting in injury
  • 11. Debrief team
    • Inadequate debrief leading to complacency
    • Miscommunication of instructions
  • 12. Disposal of replaced tiles
    • Irregular disposal methods
    • Lacerations from broken tiles
  • 13. Transporting replacement tiles
    • Manual handling injuries
    • Damaging new tiles
  • 14. Arrange access to roof
    • Unstable access
    • Falling from height
  • 15. Loading and unloading machinery
    • Manual handling injuries
    • Machinery malfunction
  • 16. Use of hand and power tools
    • Incorrect usage
    • Defective tools
  • 17. Work around electrical wires
    • Shock hazards
    • Fires due to improper separation
  • 18. Finalise worksite clearance
    • Tripping hazards
    • Left-out debris causing injury
  • 19. Documentation and reporting
    • Data inaccuracies
    • Compliance issues
  • 20. Clean-up and disposal
    • Inadequate disposal methods
    • Hazardous materials handling

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Roof Tile Displacement Risk Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart