Roof Assessment For Solar Placement Safe Work Method Statement (SWMS)

$96.80

The Roof Assessment For Solar Placement Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Roof Assessment For Solar Placement Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Roof Assessment For Solar Placement Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Roof Assessment For Solar Placement Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Roof Assessment For Solar Placement Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Roof Assessment For Solar Placement Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Roof Assessment For Solar Placement Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping over materials
    • Exposure to harmful substances
  • 2. Site Assessment
    • Falling from height
    • Dangerous weather conditions
  • 3. Placement Planning
    • Risks associated with electricity and wires
    • Incorrect placement causing structural issues
  • 4. Equipment Setup
    • Handling heavy equipment
    • Risks of electrical shock
  • 5. Roof Accessibility Prep
    • Slips
    • trips and falls
    • Damage to roof due to improper securing measures
  • 6. Equipment Transportation
    • Manual handling injuries
    • Dropping heavy tools/equipment
  • 7. Panel Installation
    • Falls from height
    • Improper installation causing future risks
  • 8. Wiring Connection
    • Electric Shock
    • Incorrect wiring causing a fire hazard
  • 9. System Testing
    • Risks associated with electricity
    • Incorrect result interpretation
  • 10. Safety Barrier Removal
    • Injury due to incorrect removal process
    • Tripping over barrier materials
  • 11. Clean up And Waste Disposal
    • Cuts from sharp objects
    • Inhaling harmful dust or chemicals
  • 12. Documentation & Reporting
    • Musculoskeletal disorders from prolonged sitting
    • Mental stress
  • 13. Emergency Procedure Training
    • Incorrect knowledge leading to hazards in an emergency
    • Stress from emergency situations
  • 14. Regular Maintenance And Upkeep
    • Falling from height during checks
    • Electrical hazards while handling panels
  • 15. Solar Panel Replacement Risk
    • Electrical shocks
    • Falls from height during replacement
    • Incorrect installation
  • 16. Decommissioning Plan Training
    • Lack of knowledge can lead to future hazards
    • Stress from misunderstanding procedures
  • 17. Final Inspection
    • Trips and falls
    • Misidentification of potential hazards
  • 18. Customer Handover
    • Miscommunication could lead to hazardous situations in the future
  • 19. Post-installation Monitoring
    • Inadequate follow-ups may result in undetected issues causing risks
    • Musculoskeletal disorders from prolonged computer use
  • 20. Periodic Risk Assessment
    • Inaccurate inspection causing unnoticed risks
    • Mental stress

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Roof Assessment For Solar Placement Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart