Road Marking Machine Safe Work Method Statement (SWMS)

$96.80

The Road Marking Machine Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Road Marking Machine Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Safe Work Method Statement Template for Road Marking Machine: Product Description

  • Pre-filled and Comprehensive: Our template comes pre-filled with standard industry information, sparing you the chore of starting from scratch. It’s comprehensive in that it takes into account all possible scenarios involved in operating a road marking machine.
  • Fully editable and customisable in Microsoft Word format: Few things are as frustrating as encountering an uneditable document. Our template is fully editable and customisable in Microsoft Word, giving you control to adapt the information to suit your specific needs.
  • Includes Project Scope and Details: Often forgotten, yet vital – the scope of your project and its finer details are addressed within this template. This assures everyone on site knows what’s involved and what exactly they’re working towards.
  • High Risk Machinery Checklist: Safety is our mantra and this template includes a thorough checklist of any high-risk machinery present on site, to ensure every necessary precaution has been considered.
  • Staff Training Record Space: It includes ample space dedicated for noting down any staff training conducted to increase awareness and proficiency, thereby enhancing safety on the job.
  • Incorporates Before and After Risk Ratings: An essential element of risk management, these ratings provide a clear visualisation of how effectively safety measures have been implemented and offers areas for improvement.
  • Legislative References Included: We’ve gone the extra mile by providing resources for relevant legislative references, saving you the hassle of sourcing them elsewhere.
  • PPE Requirements Compiled: To make safety compliance simpler, our template dutifully lists out all necessary Personal Protective Equipment (PPE), ensuring workers wear the right gear at all times.
  • Risk Assessment Matrix plus Assessment: Vital risk assessment forms are integrated into the template, accompanied by an easy-to-understand matrix that aids in identifying and managing potential hazards.
  • Checklist for SWMS Implementation Requirements: Guaranteeing not a single requirement will be missed, we’ve included a thorough checklist. This is to ensure your Safe Work Method Statement (SWMS) implementation runs smoothly.
  • Sign-Off Page for All Workers: Keeping track of who’s read and understood their obligations is made possible with our signed acknowledgement page for all workers and responsible persons.
  • Easy to Use, Easy to Customise: We’ve put a great deal of thought into design and usability, making it both straightforward for you to use and tweak to your needs.
  • Perfect for Large Contracts and Tenders: Our fully comprehensive template handles tier 1 contractual work or tenders, rather effortlessly.
  • Email Delivery at Lightning Speed: Get our template without delay, as we deliver directly to your inbox as soon as payment is cleared.

Please remember, while we endeavour to address everything, safety in the workplace can sometimes be circumstantial. Always aim to stay updated on new safety measures or requirements relevant to your operations! Let’s reduce the risk.


The Road Marking Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips and trips
    • incorrect use of equipment
  • 2. Machine Set-up
    • Machine malfunctions
    • noise
  • 3. Applying Markings
    • Traffic accidents
    • poor visibility
  • 4. Breaks & Rest Periods
    • Dehydration
    • fatigue
  • 5. Clean Up
    • Chemical spills
    • slips on wet surfaces
  • 6. Maintenance
    • Equipment break downs
    • cuts or abrasions
  • 7. Transportation
    • Vehicle accidents
    • load shifting
  • 8. Training
    • Incorrect use of machine
    • misunderstand instructions
  • 9. Inspection
    • Failure to spot issues
    • miscommunication
  • 10. Emergency Response
    • Panic reaction
    • handling injuries
  • 11. Refuelling
    • Fuel spills
    • fire hazards
  • 12. Weather Monitoring
    • Slippery surfaces
    • poor visibility
  • 13. Document Control
    • Misinformation
    • non-compliance
  • 14. Communication
    • Non-compliance
    • misunderstanding
  • 15. Material Handling
    • Heavy lifting
    • chemical fume inhalation
  • 16. Hazard Identification
    • Inadequate risk assessment
    • overlooked hazards
  • 17. PPE Usage
    • Incorrect fit
    • lack of protection
  • 18. Tool Use
    • Unexpected breakdown
    • injury from improper use
  • 19. Work Zone Set Up
    • Intrusion of pedestrians or vehicles
    • inappropriate signage
  • 20. Fatigue Management
    • Reduced concentration
    • slower reaction times

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Road Marking Machine Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart