Risk Of Overextension Reach Safe Work Method Statement (SWMS)

$96.80

The Risk Of Overextension Reach Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Risk Of Overextension Reach Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Risk Of Overextension Reach Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Risk Of Overextension Reach Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Risk Of Overextension Reach Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Risk Of Overextension Reach Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Risk Of Overextension Reach Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect lifting technique
    • lack of safety training
  • 2. Task Analysis
    • Poor task design
    • improper tools and equipment
  • 3. Equipment Check
    • Failing equipment
    • improper use of equipment
  • 4. Setup Workspace
    • Cluttered workspace
    • inadequate space
  • 5. Work Execution
    • Overreach
    • repetitive movement
  • 6. Breaks
    • Lack of breaks
    • fatigue
  • 7. Communication
    • Poor communication
    • distraction
  • 8. Load Handling
    • Excessive load
    • awkward postures
  • 9. Use Of Ladder
    • Inappropriate ladder use
    • falling from height
  • 10. Clear Up
    • Incorrect disposal methods
    • injury from sharp objects
  • 11. Reporting
    • Not reporting hazards
    • incomplete reports
  • 12. Routine Check
    • Ignored wear and tear
    • overlooked hazard checks
  • 13. Machine Operation
    • Unplanned machine startup
    • lack of maintenance
  • 14. Change of Duties
    • Misunderstanding
    • lack of knowledge
  • 15.Unforeseen Circumstances
    • Rushing
    • complacency
  • 16.Equipment Dismantling
    • Lack of proper procedures
    • injury from machinery
  • 17.Documentation
    • Miscommunication
    • misplaced documents
  • 18.Material Transport
    • Overloading
    • incorrect loading technique
  • 19. Information Exchange
    • Incorrect information
    • miscommunication
  • 20.Evaluation
    • Non-compliance
    • ignoring safety measures

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Risk Of Overextension Reach Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart