Risk Of Falls From Defective Ladders Safe Work Method Statement (SWMS)

$96.80

The Risk Of Falls From Defective Ladders Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Risk Of Falls From Defective Ladders Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Risk Of Falls From Defective Ladders Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Risk Of Falls From Defective Ladders Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Risk Of Falls From Defective Ladders Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Risk Of Falls From Defective Ladders Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Risk Of Falls From Defective Ladders Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Ladder instability
    • Inadequate inspection of equipment
  • 2. Transporting ladder
    • Manual handling injuries
    • Struck by moving objects
  • 3. Setting up ladder
    • Incorrect placement
    • Ladder instability
  • 4. Ascending ladder
    • Environmental hazards (e.g. wind)
    • Falls due to lack of support system
  • 5. Working at heights
    • Falls from defective rungs/steps
    • Over-reaching causing balance loss
  • 6. Descending ladder
    • Slips
    • trips and falls
    • Poor visibility
  • 7. Dismantling and Storing
    • Stored in unsafe location
    • Incorrect manual handling
  • 8. Regular Maintenance
    • Inadequate safety checks
    • Ignoring signs of wear and tear
  • 9. Emergency procedures
    • Inadequate training
    • Lack of appropriate emergency equipment
  • 10. Safe disposal of defective ladders
    • Inappropriate disposal methods
    • Manual handling injuries
  • 11. Communication and Training
    • Inaccurate information disseminated
    • Workers not trained in risk management
  • 12. Health and wellbeing
    • Extended periods without breaks
    • Lack of hydration or sun protection
  • 13. Personal Protective Equipment
    • Improper use of PPE
    • Lack of appropriate PPE
  • 14. Substandard Conditions
    • Poor lighting
    • Uneven or unstable work surface
  • 15. Incident Reporting
    • Inadequate reporting methods
    • Failure to report incidents
  • 16. Documentation and record keeping
    • Failure to document near misses
    • Logging false information
  • 17. Auditing and review process
    • Non-compliance
    • Skipping audits and reviews
  • 18. Safety inspections
    • Overlooking minor defects
    • Inadequate training in safety inspection
  • 19. Hazards from tools and equipment
    • Unsafe usage of tools
    • Tools in poor condition
  • 20. Breaches of legislative requirements
    • Non-compliance
    • Lack of understanding of legislation

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Risk Of Falls From Defective Ladders Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart