Ripper Usage Safe Work Method Statement (SWMS)

$96.80

The Ripper Usage Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Ripper Usage Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Ripper Usage Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Ripper Usage Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Ripper Usage Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Ripper Usage Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Ripper Usage Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Improper training
    • Inadequate personal protective equipment (PPE)
  • 2. Equipment check
    • Faulty ripper
    • Lack of maintenance
  • 3. Ripper installation
    • Falling objects from height
    • Incorrect installation procedure
  • 4. Site setup
    • Unsecured site
    • Existence of other hazardous materials on site
  • 5. Operating the ripper
    • Operating without awareness of surrounding
    • Mechanical failure
  • 6. Loading material onto ripper
    • Overloading
    • Unstable load
  • 7. Material transportation
    • Vehicle collision
    • Spilling of materials
  • 8. Unloading materials
    • Falling objects
    • Sudden release of stored energy
  • 9. Ground leveling
    • Inadequate safety measures
    • Improper use of ripper
  • 10. Daily inspection
    • Negligence in inspection
    • Lack of technical knowledge
  • 11. Maintenance task
    • Lack of proper tooling
    • Inadequate training
  • 12. Debris removal
    • Exposure to harmful substances
    • Chemical hazards
  • 13. Night operation
    • Poor lighting
    • Fatigue
  • 14. Equipment shutdown
    • Incorrect shutdown procedure
    • Negligent operator practice
  • 15. Emergency actions
    • Lack of emergency plans
    • Poor communication
  • 16. Reporting and documentation
    • Lack of compliance
    • Late reporting
  • 17. Site demobilisation
    • Unorganised shutdown
    • Unattended hazardous materials
  • 18. Ripper dismantling
    • Incorrect dismantling procedure
    • Mishandling of tool parts
  • 19. Inspection before leaving
    • Negligence in inspection
    • Hazards left on site
  • 20. Training and competence improvement
    • Improper training procedure
    • Insufficient skill levels

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Ripper Usage Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart