Restoration Works Safe Work Method Statement (SWMS)

$96.80

The Restoration Works Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Restoration Works Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Restoration Works Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Restoration Works Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Restoration Works Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Restoration Works Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Restoration Works Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • trips
    • falls
    • incorrect handling of materials
  • 2. Site Inspection
    • Unforeseen risks
    • improper equipment
  • 3. Equipment Check
    • Faulty equipment
    • Inadequate training
  • 4. Assembling Materials
    • Heavy lifting injuries
    • Incorrect handling of materials
  • 5. Restoration Work Start
    • Exposure to harmful substances
    • Working at heights
    • Inadequate machinery guard
  • 6. Material Handling
    • Manual handling injuries
    • Struck by falling objects
  • 7. Machinery Operation
    • Noise
    • Vibration
    • Machine entanglement
    • Cuts & Abrasions
  • 8. Electrical Safety
    • Electrocution
    • Fire hazard
  • 9. Use of Hand Tools
    • Inappropriate use of tools
    • Tool failure
  • 10. Welding Works
    • Eye injury
    • Burns
    • Fire hazard
  • 11. Painting
    • Chemical exposure
    • Incorrect use of personal protective equipment
  • 12. Mould Removal
    • Exposure to mould
    • Inadequate ventilation
  • 13. Clean Up
    • Improper waste disposal
    • Inadequate cleaning procedures
  • 14. Deconstruction
    • Fall from height
    • Falling debris
    • Noise
    • Dust
  • 15. Hazardous-Waste Management
    • Chemical burns
    • Inhalation of toxic fumes
  • 16. Final Inspection
    • Overlooking minor faults
    • Inadequate documentation
  • 17. Disposal of Waste Material
    • Improper lifting
    • Exposure to hazardous materials
  • 18. Report Preparation
    • Inadequate reporting procedures
    • Missing vital information
  • 19. Debriefing
    • Ineffective communication
    • Lack of proper documentation
  • 20. Review and Maintenance
    • Irregular checks
    • Omission of checklists

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Restoration Works Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart