Restocking Products On High Shelves Safe Work Method Statement (SWMS)

$96.80

The Restocking Products On High Shelves Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Restocking Products On High Shelves Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Restocking Products On High Shelves Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Restocking Products On High Shelves Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Restocking Products On High Shelves Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Restocking Products On High Shelves Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Restocking Products On High Shelves Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Improper handling technique
    • unsecured ladder
  • 2. Inspection of Equipment
    • Defective equipment
    • incorrect usage of equipment
  • 3. Safety Measures
    • Insufficient personal protective equipment
    • lack of emergency procedure
  • 4. Setting Up Ladder
    • Improper placement of ladder
    • slippage hazard
  • 5. Ascending Ladder
    • Fall from height
    • item falling on person below
  • 6. Retrieving Products
    • Strained muscles
    • overexertion
  • 7. Descending Ladder
    • Poor grip
    • misstep
  • 8. Stocking Shelves
    • Repeated heavy lifting
    • awkward postures
  • 9. Removing Unwanted Debris
    • Cut/puncture hazards
    • slipping or tripping
  • 10. Stabilising Products on Shelf
    • Balance loss
    • fall of objects
  • 11. Dismantling Ladder
    • Incorrect storing methods
    • collapsing equipment
  • 12. Reporting Procedure
    • Miscommunication
    • delayed reporting
  • 13. Cleaning Work Area
    • Exposure to harmful substances
    • slip and fall hazard
  • 14. Storage of Equipment
    • Improper storage procedures
    • fall hazard due to cluttered storage area
  • 15. Training Procedures
    • Inadequate training
    • non-adherence to safety protocols
  • 16. Emergency Procedures
    • Non-compliance to safety drills
    • failure to respond in a crisis
  • 17. Health Check-up Procedures
    • Ignoring health symptoms
    • failure to disclose medical conditions
  • 18. Maintenance of Equipment
    • Failure to maintain equipment
    • use of faulty equipment
  • 19. Reviewing Safety Guidelines
    • Lack of awareness about safety measures
    • disregard for safety guidelines
  • 20. Final Check
    • Overlooked hazards
    • incorrect handling and storage methods

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Restocking Products On High Shelves Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart