Reset Pins At Bowling Lanes Safe Work Method Statement (SWMS)

$96.80

The Reset Pins At Bowling Lanes Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Reset Pins At Bowling Lanes Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Reset Pins At Bowling Lanes Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Reset Pins At Bowling Lanes Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Reset Pins At Bowling Lanes Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Reset Pins At Bowling Lanes Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Reset Pins At Bowling Lanes Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Possible musculoskeletal injury from setup
    • Electrical hazards from equipment
  • 2. Assess Lane Conditions
    • Slips
    • trips and falls from oil residue
    • Exposure to harsh lighting
  • 3. Operate Lane Machine
    • Entrapment or crush injuries
    • Electrical hazards from control panel
  • 4. Replace Fallen Pins
    • Manual handling risks
    • Struck by moving objects
  • 5. Clearing Ball Return System
    • Noise exposure
    • Being struck by moving parts
  • 6. Area Inspection
    • Struck by flying objects
    • Slips
    • trips and falls from oil residues
  • 7. Routine Maintenance
    • Electrical shock hazard
    • Crush injury from moving components
  • 8. Repair works
    • Exposure to hazardous substances
    • High noise levels
  • 9. Re-align Pinsetters
    • Musculoskeletal risk from repetitive motion
    • Struck by moving objects
  • 10. Lane Resetting
    • Risk of falling items
    • Manual handling risk
  • 11. Testing Pinsetter Operation
    • Caught in/between mechanical parts
    • Loud noise exposure
  • 12. Return to Operations
    • Risk of electrical shock from malfunctions
    • Exposure to high noise levels
  • 13. Work Area Clearance
    • Trips over trailing cables
    • Cuts from sharp objects
  • 14. Post-maintenance Assessment
    • Exposure to excessive noise
    • Exposure to hydraulic fluid
  • 15. Reporting & Documentation
    • Eyestrain from prolonged screen use
    • Repetitive Strain Injury (RSI)

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Reset Pins At Bowling Lanes Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart