Removing Transporting Thorny Plants Safe Work Method Statement (SWMS)

$96.80

The Removing Transporting Thorny Plants Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Removing Transporting Thorny Plants Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Removing Transporting Thorny Plants Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Removing Transporting Thorny Plants Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Removing Transporting Thorny Plants Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Removing Transporting Thorny Plants Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Removing Transporting Thorny Plants Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect handling of tools and equipment
    • Physical contact with thorny plants
  • 2. Identifying Work Area
    • Back strain from bending
    • Tripping over garden materials
  • 3. Gather Needed Tools/Equipment
    • Injury from using sharp tools
    • Repetitive strain injuries
  • 4. Using Safety Gear
    • Inadequate protection
    • Misuse of safety gear leading to injury
  • 5. Removing Plants
    • Skin scratches or punctures from thorns
    • Sprain or strain from lifting
  • 6. Bagging/Carting Plants
    • Dermatitic reaction to plant
    • Strain from lifting heavy weight
  • 7. Transporting to Designated Area
    • Trips and falls while moving bags
    • Tipping over of cart
  • 8. Unloading/Breakdown
    • Repetitive movement causing strain
    • Thorns puncturing skin during breakdown
  • 9. Clearing Work Area of Debris
    • Slips
    • trips
    • and falls from residual debris
    • Mishandling of sharp objects
  • 10. Cleaning Tools/Equipment
    • Skin puncture from thorns remaining on equipment
    • Chemical exposure during cleaning
  • 11. Storing Tools/Equipment
    • Misplacement leading to trip hazard
    • Inappropriate storing causing damage
  • 12. Reviewing Work Area
    • Missed hazardous materials causing potential harm
    • Overlooking important issues due to lack of concentration
  • 13. Final Inspection
    • Strains and sprains from continual bending/kneeling
    • Allergic reactions com plant exposure
  • 14. Reporting and documentation
    • Eye strain from computer work
    • Incorrect reporting leading to future hazards
  • 15. Waste Disposal
    • Exposure to hazardous substances
    • Injury due to incorrect lifting techniques

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Removing Transporting Thorny Plants Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart