Remove Guttering Or Drainpipes At Height Safe Work Method Statement (SWMS)

$96.80

The Remove Guttering Or Drainpipes At Height Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Remove Guttering Or Drainpipes At Height Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Remove Guttering Or Drainpipes At Height Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Remove Guttering Or Drainpipes At Height Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Remove Guttering Or Drainpipes At Height Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Remove Guttering Or Drainpipes At Height Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Remove Guttering Or Drainpipes At Height Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Poor planning
    • Inadequate equipment selection
  • 2. Training and Induction
    • Lack of knowledge
    • Poor communication
  • 3. Personal Protective Equipment Selection
    • Inadequate PPE
    • Incorrect usage of PPE
  • 4. Ladder Setup
    • Instable ground
    • Incorrect ladder positioning
  • 5. Climbing the Ladder
    • Slips
    • Trips and falls
  • 6. Inspection of Guttering/Drainpipes
    • Contact with hazardous materials
    • Biological hazards (birds/bats/pests)
  • 7. Removing Debris from Gutters
    • Slips
    • trips and falls
    • Manual handling injuries
  • 8. Loosening of Guttering or Drainpipes
    • Falling objects
    • Cuts and abrasions
  • 9. Removal of Guttering or Drainpipes
    • Manual handling
    • Falling objects
  • 10. Lowering Guttering or Drainpipes to Ground
    • Manual handling
    • Falling object
  • 11. Disposal of Removed Materials
    • Biological hazards
    • Inappropriate disposal methods
  • 12. Cleaning up work area
    • Trips
    • Falls
    • Cuts
  • 13. Transportation of Removed Material
    • Moving vehicle incident
    • Improper securing loads
  • 14. Unloading removed material at disposal site
    • Manual handling
    • Falls from height
  • 15. Review
    • Failure to capture lessons learned
    • Lack of continuous improvement
  • 16. Safe Systems Work
    • Non-compliance
    • Failure to adhere to safety standards
  • 17. Equipment Maintenance
    • Inadequate maintenance leading to equipment failure
    • Hazards posed by faulty equipment
  • 18. Incident Management and Reporting
    • Failure to report incidents
    • Inaccurate incident reporting
  • 19. Return of all unused materials/Equipment
    • Manual handling
    • Hazardous substances
  • 20. Debriefing and Closure
    • Overlooking potential problems for future projects
    • Failing to exchange essential information

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Remove Guttering Or Drainpipes At Height Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart