Layout And Installation Of Forms Safe Work Method Statement (SWMS)

$96.80

The Layout And Installation Of Forms Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Layout And Installation Of Forms Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Layout And Installation Of Forms Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Layout And Installation Of Forms Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Layout And Installation Of Forms Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Layout And Installation Of Forms Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Layout And Installation Of Forms Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Trip and fall hazards
    • cuts from sharp objects
    • injury from falling objects
  • 2. Selecting and handling forms
    • Splinters from wooden formwork
    • manual handling injuries
    • slip and fall risks
  • 3. Initial layout of forms
    • Incorrect alignment causing structural instability
    • injury from misusing tools
  • 4. Securing forms in place
    • Falling from height
    • injury from power tools
    • dropping tools/materials on others below
  • 5. Checking forms for accuracy
    • Risk of collapse due to incorrectly installed formwork
    • trip hazard from walking over formwork
  • 6. Pouring concrete into forms
    • Manual handling risks
    • risk of burns from wet cement
    • dust inhalation
  • 7. Removing forms
    • Risks of falling pieces
    • splinters
    • trip risks
  • 8. Inspecting final structure
    • Injury from loose or unstable structures
    • slip or fall risks
  • 9. Clean up work area
    • Slips
    • trips
    • and falls
    • handling sharps discarded materials
  • 10. Disposal of waste material
    • Improper disposal leading to environmental harm
    • injury from handling broken material
  • 11. Transporting used forms
    • Manual handling injuries
    • risk of running over foot
  • 12. Repair and storage of forms
    • Risk of getting hit by improperly stacked forms
    • risk from power tool use in repair
  • 13. Training on Emergency procedures
    • non-compliance failure due to lack of understanding standards and procedures
  • 14. Equipment maintenance
    • Injury due to faulty machinery
    • Electrical shock
  • 15. Conducting routine safety checks
    • Ignorance of safety procedures leading to faulty operations
    • Injury due to unchecked hazards

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Layout And Installation Of Forms Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.