Lay New Roofing Safe Work Method Statement (SWMS)

$96.80

The Lay New Roofing Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Lay New Roofing Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Lay New Roofing Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Lay New Roofing Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Lay New Roofing Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Lay New Roofing Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Lay New Roofing Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Mishandling tools
    • Slips
    • trips and falls
  • 2. Site Setup
    • Unsecured materials
    • Falling debris
  • 3. Accessing Roof
    • Falls from height
    • Unstable roof fixtures
  • 4. Removing old roofing
    • Asbestos exposure
    • Sharp objects
  • 5. Cleaning up
    • Risk of lacerations
    • Overexertion
    • Dust inhalation
  • 6. Measure & cut new roofing
    • Incorrect measurements
    • Hand tool injuries
  • 7. Installing underlayment
    • Heat stroke
    • Slippery surfaces
  • 8. Laying shingles
    • Nail gun misfires
    • Falls from height
  • 9. Trimming & fitting
    • Risk of lacerations
    • Incorrect fitting
  • 10. Installing flashing
    • Electrocution hazards
    • Snag hazard
  • 11. Sealing roof
    • Chemical burns or Toxic fumes
  • 12. Cleanup & waste disposal
    • Trips over debris
    • Hazardous substance spills
  • 13. Inspection & maintenance
    • Overlooking flaws
    • Limited access
  • 14. Final Inspection
    • Missed defects
    • Ineffective work
  • 15. Job completion & sign off
    • Non-completion of tasks
    • Failure to follow procedures

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Lay New Roofing Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart