Installation of Refrigeration Plant Safe Work Method Statement (SWMS)

$96.80

The Installation of Refrigeration Plant Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Installation of Refrigeration Plant Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

“`html

If you’re in the business of installing refrigeration plants and keeping everything up to code, then our Safe Work Method Statement (SWMS) Template for Installation of Refrigeration Plant is exactly what you need. This template is designed with ease-of-use and comprehensive safety measures in mind, making your job a whole lot easier. Here’s what you can expect:

Pre-filled and Comprehensive

This template comes pre-filled with detailed information relevant to the installation of refrigeration plants. We’ve covered various scenarios and safety measures to save you time and effort.

Fully editable and customisable in Microsoft Word format for easy editing

Our SWMS template is provided in Microsoft Word format, making it fully editable. You can easily adjust any part of the document to better fit your specific needs or circumstances on-site.

Includes the scope of the project and the project details

It features sections where you can clearly define the scope of the project and fill in essential project details, giving everyone involved a clear understanding of what’s expected.

Includes checklist of any high risk machinery on site

Identify and list all high-risk machinery on-site with an included checklist to ensure all equipment is accounted for and managed appropriately.

Includes space for recording any staff training

Keep track of staff training effortlessly with designated spaces to record who has been trained and on what specific safety procedures and machinery.

Includes before and after risk ratings

This feature helps you to understand the impact of your safety measures by comparing risk ratings before and after implementing your controls.

Includes resources for use of legislative references

We’ve included useful legislative references to help you stay compliant with Australian work health and safety regulations.

Includes all PPE required

No more guessing about what personal protective equipment (PPE) is needed—the template lists all necessary PPE to ensure worker safety during the project.

Includes risk assessment and risk assessment matrix

The included risk assessment and matrix make evaluating different levels of risk straightforward and manageable, helping you prioritise safety actions.

Includes a checklist to ensure all requirements have been covered when implementing the SWMS

A handy checklist ensures that every requirement is double-checked and every box ticked when putting your SWMS into action.

Includes sign off page for all workers and responsible persons

Accountability is key, and this template includes a sign-off page for all workers and responsible persons to confirm they’ve read and understood the SWMS.

Easy to use, easy to customise

User-friendliness was a top priority. The template is straightforward to navigate and customise, so you can spend less time editing and more time getting the job done.

Suitable for large contracts and Tenders, including tier 1 contractual work

Whether you’re dealing with small projects or large contracts and tenders, our SWMS template is robust enough to suit tier 1 contractual work requirements.

Quick delivery by email

No waiting around—get your template quickly via email so you can start using it straight away.

Investing in our Safe Work Method Statement (SWMS) Template for Installation of Refrigeration Plant means investing in safer work practices and ensuring compliance with industry regulations. If you’ve got any questions or need assistance, we’re here to help.

“`


The Installation of Refrigeration Plant Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • safety documentation not complete
    • site induction ignored
  • 2. Arrive at Site
    • traffic hazards
    • slips/trips/falls
  • 3. Unload Equipment
    • manual handling injuries
    • equipment fall
  • 4. Site Inspection
    • unidentified hazards
    • unsafe structures
  • 5. Set Up Work Area
    • poor ergonomics
    • electrical hazards
  • 6. Electrical Isolation
    • electric shock
    • arc flash
  • 7. Position Plant Components
    • crushing injuries
    • lifting strain
  • 8. Connect Refrigeration Piping
    • chemical exposure
    • burns
  • 9. Connect Electrical Wiring
    • electrocution
    • fire
  • 10. Install Control Systems
    • equipment malfunction
    • poor wiring
  • 11. Test Electrical Systems
    • electrical faults
    • equipment failure
  • 12. Charge Refrigeration System
    • refrigerant leak
    • pressure hazards
  • 13. Test Refrigeration Plant
    • system failure
    • refrigeration burns
  • 14. Commission System
    • unexpected auto-start
    • noise
  • 15. Final Inspection
    • missing checks
    • incomplete documentation
  • 16. Clean Work Area
    • sharp objects
    • waste management
  • 17. Handover to Client
    • miscommunication
    • operation misunderstanding

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Installation of Refrigeration Plant Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart