Expansion Of Existing Electrical Systems Safe Work Method Statement (SWMS)

$96.80

The Expansion Of Existing Electrical Systems Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Expansion Of Existing Electrical Systems Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Expansion Of Existing Electrical Systems Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Expansion Of Existing Electrical Systems Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Expansion Of Existing Electrical Systems Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Expansion Of Existing Electrical Systems Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Expansion Of Existing Electrical Systems Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Electrical shock
    • Trip hazards
  • 2. Site Inspection
    • Electrical shock
    • Falling objects
  • 3. Risk Assessment
    • Incorrect information
    • Failing to identify hazards
  • 4. Equipment & Tools Check
    • Faulty equipment
    • Incorrect tool usage
  • 5. Cable Laying
    • Back injury due to manual handling
    • Slips
    • trips and falls
  • 6. Installation of Electrical Boxes
    • Electrocution
    • Working at height
  • 7. Wiring Connections
    • Electrical burns
    • Eye injury from hot sparks
  • 8. Insulation of Wires
    • Skin Irritation
    • Fire hazard
  • 9. Installation of Switches
    • Electrical shock
    • Falls when working from height
  • 10. Testing of System
    • Electrical shock
    • Inaccurate testing
  • 11. Safety Checks
    • Missed faults
    • overlooks
  • 12. System Activation
    • Surge in electrical power
    • Overheating
  • 13. Documentation
    • Incorrect data recording
    • Omitted steps
  • 14. Clean up
    • Slip and trip hazards
    • Misplaced tools
  • 15. Maintenance
    • Inadequate servicing
    • Component failure
  • 16. Troubleshooting
    • Improper isolation of power
    • Incorrect troubleshooting methods
  • 17. De-energisisation (shutting down)
    • Electric shock
    • Fire
  • 18. Emergency Response
    • Inadequate response
    • Panic
  • 19. Review Operations
    • Corrective measure overlooked
    • Incomplete review
  • 20. Final Report
    • Omit crucial information
    • Incorrect data input

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Expansion Of Existing Electrical Systems Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart