Erect Fencing Safe Work Method Statement (SWMS)

$96.80

The Erect Fencing Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Erect Fencing Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Erect Fencing Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Erect Fencing Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Erect Fencing Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Erect Fencing Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Erect Fencing Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping over tools
    • Exposure to excessive noise
  • 2. Material Handling
    • Manual handling injuries
    • Slip
    • trip and fall hazards
  • 3. Equipment Check
    • Electric shock from faulty equipment
    • Cut injuries from sharp objects
  • 4. Site Preparation
    • Uneven ground causing trips
    • Back injury from lifting heavy fencing
  • 5. Fencing Installation
    • Risk of falling when working at height
    • Hand injuries from using tools
  • 6. Equipment Operation
    • Crush injuries
    • Hearing loss from noisy equipment
  • 7. Post-Installation Check
    • Slips
    • trips and falls
    • Falling objects during inspection
  • 8. Finishing Works
    • Eye irritation from dust
    • Chemical exposure from finishing products
  • 9. Waste Disposal
    • Sharp object injuries
    • Hazardous waste exposure
  • 10. Clean Up
    • Slip
    • trip and fall hazards
    • Manual handling injuries
  • 11. Tool Maintenance
    • Cut injuries from sharp tools
    • Electric shock from power tools
  • 12. Equipment Inspection
    • Falls during equipment inspection
    • Crushing injuries from equipment failures
  • 13. Final Checks
    • Falling objects
    • Electric shock from unfinished electrical work
  • 14. Documentation Update
    • Eye strain from computer work
    • Repetitive strain injuries from typing
  • 15. Debriefing
    • Mental stress from incident discussions
    • Eyestrain from detailed document review
  • 16. Post-Work Assessment
    • Tripping hazards
    • Back injuries from handling paperworks
  • 17. Equipment Storage
    • Manual handling injuries
    • Trip hazards from poorly stored equipment
  • 18. Site Restoration
    • Hazards left uncontrolled on site
    • damage to property
  • 19. Review and Feedback
    • Psychological stress from negative feedback
    • Strain from extended meetings
  • 20. Follow up Actions
    • Mental stress from additional work
    • Physical strain from extra hours

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Erect Fencing Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart