Enter Confined Spaces Like Maintenance Tunnels Safe Work Method Statement (SWMS)

$96.80

The Enter Confined Spaces Like Maintenance Tunnels Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Enter Confined Spaces Like Maintenance Tunnels Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Enter Confined Spaces Like Maintenance Tunnels Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Enter Confined Spaces Like Maintenance Tunnels Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Enter Confined Spaces Like Maintenance Tunnels Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Enter Confined Spaces Like Maintenance Tunnels Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Enter Confined Spaces Like Maintenance Tunnels Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Accidental falls
    • Poor lighting
  • 2. Equipment assessment
    • Faulty machinery
    • Electrical hazards
  • 3. Entry into the tunnel
    • Slips and falls
    • Insufficient oxygen levels
  • 4. Work in confined space
    • Trip hazards
    • Exposure to toxic substances
  • 5. Communication Procedures
    • Inefficient communication
    • Noise pollution
  • 6. Emergency Procedure Training
    • Lack of knowledge
    • Inadequate training
  • 7. Air Quality Monitoring
    • Toxic gas
    • lack of ventilation
  • 8. Protective equipment usage
    • Improper use
    • Lack of protective gear
  • 9. Restricted movement
    • Musculoskeletal injuries
    • Cramp Hazards
  • 10. Exiting Tunnel
    • Tripping
    • Falls
  • 11. Debriefing and Reporting
    • Miscommunication
    • Document errors
  • 12. Equipment maintenance
    • Faulty equipment
    • Electric shock
  • 13. Periodic Review
    • Poor review protocol
    • Missed hazards
  • 14. Waste Management
    • Improper handling of hazardous materials
    • Dust
  • 15. Equipment Restoration
    • Injury during restoration
    • Improper restoration
  • 16. Permission for Re-entry
    • Repeat hazard exposure
    • Unmonitored entry
  • 17. Backfilling (soil replacement)
    • Dust inhalation
    • Heavy lifting injury
  • 18. Site Clean-up
    • Trips and falls
    • Sharp objects injury
  • 19. Job Completion Check
    • Inadequate checks
    • Oversight of issues
  • 20. Record Keeping
    • Mismanagement of records
    • Loss of important documents

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Enter Confined Spaces Like Maintenance Tunnels Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart