Elevated Platform Use Safe Work Method Statement (SWMS)

$96.80

The Elevated Platform Use Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Elevated Platform Use Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Elevated Platform Use Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Elevated Platform Use Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Elevated Platform Use Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Elevated Platform Use Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Elevated Platform Use Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Failure to anticipate weather conditions
    • inappropriate selection of equipment
  • 2. Site setup
    • Inadequate access and egress points
    • tripping hazards
  • 3. Pre-start inspection
    • Faulty equipment
    • unauthorised use of equipment
  • 4. Platform assembly
    • Incorrect assembly
    • structural integrity compromise
  • 5. Operation commencement
    • Operator lacking proper training
    • operating in extreme weather conditions
  • 6. Elevation adjustment
    • Mechanical failure
    • sudden movements of the platform
  • 7. Equipment positioning
    • Misalignment
    • instability due to inappropriate ground conditions
  • 8. Working at height
    • Fall from height
    • object dropped from height
  • 9. Load handling
    • Exceeding load limit
    • unstable loads
  • 10. Adjustments during operation
    • Sudden movements
    • improper latch engagement
  • 11. Dismounting
    • Unsafe dismounting method
    • losing balance
  • 12. Post-operation inspections
    • Missing defects due to hurried checks
    • overlooking minor issues
  • 13. Equipment shutdown
    • Abrupt shutdown causing damage
    • power backup not in place
  • 14. Platform dismantling
    • Improper order of part removal
    • inadequate support structure during dismantling
  • 15. Cleanup
    • Tripping hazards
    • sharp objects left behind
    • mishandling of waste
  • 16. Reporting and documentation
    • Errors in reporting
    • not reporting all incidents
  • 17. Repair and Maintenance
    • Improper method
    • not following the manufacturer's specifications
    • unqualified personnel performing tasks
  • 18. Training
    • Poor training techniques
    • inadequate assessment of trainee ability
  • 19. Continuous Monitoring
    • Lack of vigilance
    • missing critical changes
  • 20. Emergency Response
    • Late intervention
    • inadequate emergency protocols

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Elevated Platform Use Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart