Dust And Particle Inhalation Risk Safe Work Method Statement (SWMS)

$96.80

The Dust And Particle Inhalation Risk Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Dust And Particle Inhalation Risk Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Dust And Particle Inhalation Risk Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Dust And Particle Inhalation Risk Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Dust And Particle Inhalation Risk Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Dust And Particle Inhalation Risk Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Dust And Particle Inhalation Risk Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Dust inhalation
    • eye contact with dust particles
  • 2. Protective Equipment Fitting
    • Misuse of equipment
    • dust leakage inside mask
  • 3. Site Setup
    • Deploying dusty materials
    • accidental dust cloud creation
  • 4. Work Commencement
    • Direct exposure to dust
    • accidental dust ingestion or inhalation
  • 5. Tool Utilisation
    • Dust emission from tools
    • indirect exposure via tool use
  • 6. Cleaning Operation
    • Airborne dust during cleaning
    • skin contact with dust
  • 7. Waste Disposal
    • Dust spread during disposal process
    • improper disposal
  • 8. Machine Maintenance
    • Dust accumulation in machines
    • dust release during maintenance
  • 9. Decontamination Process
    • Residue dust on clothing or equipment
    • dust inhale during the process
  • 10. Break Periods
    • Dust settling on food/drinks
    • unawareness of dust presence
  • 11. Packing up
    • Spreading of residues during disassembly
    • handling of dusty materials
  • 12. Transportation
    • Dust dispersion during transit
    • physical contact with dust-covered objects
  • 13. Loading/Unloading
    • Mishandling of dusty substances
    • transportation-related accidents leading to dust spread
  • 14. Documentation
    • Dusty paperwork
    • direct exposure while handling documents
  • 15. Review and Evaluation
    • Overlooking of potential dust hazards
    • understating the risk/importance of control
  • 16. Continuous Improvement
    • Not addressing identified risks
    • dust accumulation due to lack of improvement actions

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Dust And Particle Inhalation Risk Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart