Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Drilling Rig (Light Truck Mounted) Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Inadequate PPE
- Poor site conditions
- 2. Pre-Operational Inspection
- Unsecured equipment
- Missing safety devices
- 3. Equipment Setup
- Manual handling injuries
- Struck by moving parts
- 4. Drilling Rig Positioning
- Vehicle collision
- Unstable surface
- 5. Anchoring System Installation
- Tripping hazards
- Crush injuries
- 6. Mast Raising and Lowering
- Falls from height
- Pinch points
- 7. Drilling Process
- Entanglement in rotating parts
- Exposure to harmful substances
- 8. Adding Drill Rods
- Manual handling injuries
- Caught between objects
- 9. Rod Removal and Recovery
- Manual handling injuries
- Dropped objects
- 10. Sample Collection
- Exposure to harmful substances
- Sharp objects
- 11. Decontamination Process
- Chemical exposure
- Slippery surfaces
- 12. Rig Demobilization
- Manual handling injuries
- Inadequate securing of equipment