Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Drilling For Pipe Installations Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Tripping
- Falling objects 2M
- Inappropriate use of tools 3H
- 2. Site Inspection
- Slippery surfaces 2M
- Unidentified underground services 4A
- 3. Mark Out Drill Locations
- Incorrect layout 2M
- Striking utilities 4A
- 4. Position Drilling Machine
- Manual handling 3H
- Contact with overhead powerlines 4A
- 5. Set Up Drilling Machine
- Crushing 3H
- Pinching 2M
- 6. Drill Bore
- Dust inhalation 3H
- Noise exposure 4A
- 7. Remove Drill Stem
- Contact with moving parts 3H
- Equipment failure 4A
- 8. Insert Pipe/casing
- Heavy lifting 3H
- Caught in machinery 4A
- 9. Retrieve Drill Head
- Heavy lifting 3H
- Finger/hand injury 2M
- 10. Disconnect And Store Equipment
- Inappropriate storage causing tripping 2M
- Body stressing 3H
- 11. Backfill and Compact Hole
- Unstable work environment 3H
- Dust exposure 2M
- 12. Clean up work area
- Slipping on spills 2M
- Unsafe disposal of waste material 3H
- 13. Maintenance of Drilling Rig
- Handling heavy machinery parts 3H
- misuse/abuse of tools 2M
- 14. Staff Training
- Inadequate knowledge leading to injury 3H
- Miscommunication causing accidents 2M
- 15. Documentation and Reporting
- Incorrect documentation leading to accidents 2M
- non-compliance with regulations 4A
- 16. Waste Disposal
- Hazardous material handling 3H
- Improper disposal leading to pollution 4A
- 17. Regular Safety Meetings
- Inadequate communication leading to mishaps 2M
- Non-adherence to safety norms 3H
- 18. Emergency Procedures
- Lack of preparedness in case of emergencies 4A
- Insufficient number of safe exits 3H
- 19. Personal Protective Equipment
- Inappropriate usage leading to injury 3H
- Lack of proper PPE equipment 4A
- 20. Final Site Clean Up
- Slipping on spills 2M
- Unsafe disposal of waste material 3H