Drilling For Pipe Installations Risk Assessment

$79.50

The Drilling For Pipe Installations Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Drilling For Pipe Installations Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Drilling For Pipe Installations Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping
    • Falling objects 2M
    • Inappropriate use of tools 3H
  • 2. Site Inspection
    • Slippery surfaces 2M
    • Unidentified underground services 4A
  • 3. Mark Out Drill Locations
    • Incorrect layout 2M
    • Striking utilities 4A
  • 4. Position Drilling Machine
    • Manual handling 3H
    • Contact with overhead powerlines 4A
  • 5. Set Up Drilling Machine
    • Crushing 3H
    • Pinching 2M
  • 6. Drill Bore
    • Dust inhalation 3H
    • Noise exposure 4A
  • 7. Remove Drill Stem
    • Contact with moving parts 3H
    • Equipment failure 4A
  • 8. Insert Pipe/casing
    • Heavy lifting 3H
    • Caught in machinery 4A
  • 9. Retrieve Drill Head
    • Heavy lifting 3H
    • Finger/hand injury 2M
  • 10. Disconnect And Store Equipment
    • Inappropriate storage causing tripping 2M
    • Body stressing 3H
  • 11. Backfill and Compact Hole
    • Unstable work environment 3H
    • Dust exposure 2M
  • 12. Clean up work area
    • Slipping on spills 2M
    • Unsafe disposal of waste material 3H
  • 13. Maintenance of Drilling Rig
    • Handling heavy machinery parts 3H
    • misuse/abuse of tools 2M
  • 14. Staff Training
    • Inadequate knowledge leading to injury 3H
    • Miscommunication causing accidents 2M
  • 15. Documentation and Reporting
    • Incorrect documentation leading to accidents 2M
    • non-compliance with regulations 4A
  • 16. Waste Disposal
    • Hazardous material handling 3H
    • Improper disposal leading to pollution 4A
  • 17. Regular Safety Meetings
    • Inadequate communication leading to mishaps 2M
    • Non-adherence to safety norms 3H
  • 18. Emergency Procedures
    • Lack of preparedness in case of emergencies 4A
    • Insufficient number of safe exits 3H
  • 19. Personal Protective Equipment
    • Inappropriate usage leading to injury 3H
    • Lack of proper PPE equipment 4A
  • 20. Final Site Clean Up
    • Slipping on spills 2M
    • Unsafe disposal of waste material 3H
Shopping Cart