Drainage Works Near Trees Safe Work Method Statement (SWMS)

$96.80

The Drainage Works Near Trees Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Drainage Works Near Trees Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Drainage Works Near Trees Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Drainage Works Near Trees Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Drainage Works Near Trees Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Drainage Works Near Trees Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Drainage Works Near Trees Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inappropriate work attire
    • Lack of pre-start briefing
  • 2. Site Setup
    • Trip hazards from materials and equipment
    • Hazardous substances
  • 3. Equipment Check
    • Malfunctioning machinery
    • Inadequate training on machinery use
  • 4. Excavation Near Trees
    • accidental tree felling
    • Fauna disturbance
  • 5. Drainage Layout
    • Incorrect measurements
    • Slippery surfaces
  • 6. Materials Handling
    • Manual handling injuries
    • Falls from height
  • 7. Drainage Installation
    • Collapse of excavation
    • Falling objects
  • 8. Backfill Excavation
    • Leakage in newly installed pipes
    • Unstable ground
  • 9. Trench Compaction
    • Machinery accidents
    • Noise related incidents
  • 10. Reinstatement of Ground Surface
    • Erratic weather conditions
    • Improper surface restoration
  • 11. Waste Disposal
    • Improper waste disposal
    • Hazardous material risks
  • 12. Tree Protection Barriers
    • Falling objects
    • Safety barrier displacement
  • 13. Equipment Decontamination
    • Hazardous substances
    • Cross contamination
  • 14. Close-out Activities
    • Incomplete documentation
    • Untimely client feedback
  • 15. Emergency Procedures
    • Insufficient First Aid provision
    • Inadequate emergency response
  • 16. Review Work Processes
    • Missed hazards
    • Deficient risk assessment/controls
  • 17. Equipment Maintenance
    • Poorly maintained machinery
    • Delay in fixing faults
  • 18. Reporting and Documentation
    • Incomplete reporting
    • Lost or misplaced paperwork
  • 19. Team Debriefing Session
    • Overlooking future prevention strategies
    • Ignoring team feedback
  • 20. Works Completion
    • Faulty work completion
    • Potential hazards for future tasks

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Drainage Works Near Trees Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart