Diving At Altitude Safe Work Method Statement (SWMS)

$96.80

The Diving At Altitude Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Diving At Altitude Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Diving At Altitude Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Diving At Altitude Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Diving At Altitude Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Diving At Altitude Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Diving At Altitude Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Improper training
    • Lack of safety equipment
  • 2. Pre-dive checks
    • Equipment malfunction
    • Incorrect dive plan
    • Weather conditions
  • 3. Training and briefing
    • Inadequate understanding
    • Language barriers
  • 4. Diving commencement
    • Fatigue
    • Decompression illness
    • Hypothermia
  • 5. Underwater navigation
    • Poor visibility
    • Strong currents
  • 6. Use of tools and equipment
    • Equipment failure
    • Improper use
  • 7. Communicating with surface team
    • Miscommunication
    • Equipment failure
  • 8. Ascent
    • Oxygen toxicity
    • Lung over-expansion
  • 9. Post-dive checks
    • Equipment damages
    • Potential decompression illness
  • 10. Maintenance of diving equipment
    • Equipment malfunction
    • Use of wrong cleaning agents
  • 11. Oxygen administration
    • Excessive oxygen
    • Low oxygen levels
  • 12. Preparing for emergency evacuations
    • Insufficient emergency procedures
    • Communication issues
  • 13. Debriefing
    • Inattention
    • Incomplete information dissemination
  • 14. Post-work clean-up and storage
    • Slips
    • trips and falls
    • Incorrect storage
  • 15. Reporting
    • Incomplete documentation
    • Failure to report identified risks
  • 16. Rest and Recuperation
    • Over-exhaustion
    • Neglecting health considerations
  • 17. Equipment checks and servicing
    • Improper servicing
    • Overlooking faults in equipment
  • 18. Daily review of safety procedures
    • Non-compliance
    • Inadequate review
  • 19. Onshore preparations for the next dive
    • Inadequate preparations
    • Hasty decisions
  • 20. Closure of worksite
    • Incorrect shutdown procedures
    • Unsecured site

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Diving At Altitude Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart