Dismantling Used Wooden Pallets Safe Work Method Statement (SWMS)

$96.80

The Dismantling Used Wooden Pallets Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Dismantling Used Wooden Pallets Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Dismantling Used Wooden Pallets Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Dismantling Used Wooden Pallets Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Dismantling Used Wooden Pallets Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Dismantling Used Wooden Pallets Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Dismantling Used Wooden Pallets Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slip/trips due to clutter
    • manual handling
  • 2. Safety Check
    • Faulty safety equipment
    • inadequate safety signages
  • 3. Dismantling tools check
    • Poor condition of tools
    • incorrect tool usage
  • 4. Pallets selection
    • Infested pallets
    • damaged pallets
  • 5. Initial Breakdown
    • Splinters
    • falling objects
  • 6. Nail Removal
    • Sharp objects
    • improper disposal of nails
  • 7. De-nailing
    • Cutting
    • piercing injuries
  • 8. Sanding
    • Dust inhalation
    • eye injuries
  • 9. Assembly Check
    • Unstable pallets
    • poor quality materials
  • 10. Secondary Breakdown
    • Splinters
    • falling objects
  • 11. Cleaning Up
    • Manual handling
    • slip/trip on loose materials or clutter
  • 12. Quality Assurance
    • Defective product from using defective pallets
  • 13. Material Disposal
    • Manual lifting
    • incorrect waste disposal
  • 14. Tool Clean-up and Maintenance
    • Sharp edges
    • chemical contacts
  • 15. Unsafe area due to unmanaged waste
    • Slip/trip hazards
    • fire hazard from combustible waste
  • 16. Reporting and Documentation
    • Errors in record keeping
    • missing documents
  • 17. Staff Training
    • Inadequate staff training
    • non-compliance
  • 18. Emergency Preparedness
    • Lack of emergency procedures
    • inadequate equipment
  • 19. End of Work Assessment
    • Risk of future hazards due to overlooked current hazards
  • 20. Storage and Delivery
    • Improper pallet storage
    • transportation accidents

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Dismantling Used Wooden Pallets Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart