Depth Check Measurements Safe Work Method Statement (SWMS)

$96.80

The Depth Check Measurements Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Depth Check Measurements Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Depth Check Measurements Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Depth Check Measurements Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Depth Check Measurements Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Depth Check Measurements Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Depth Check Measurements Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping hazards
    • Electrical shock
  • 2. Equipment Check
    • Equipment failure
    • Electrical shock
  • 3. Depth Calibration
    • Incorrect reading
    • Hand injury
  • 4. Direct Measurement
    • Fall from height
    • Incorrect measurement
  • 5. Indirect Measurement
    • Misinterpretation of data
    • Equipment malfunction
  • 6. Data Recording
    • Data loss
    • Mistakes in recording
  • 7. Data Analysis
    • Incorrect interpretation
    • Miscommunication
  • 8. Reporting
    • Data breach
    • Misreporting
  • 9. Calibration Check
    • Faulty equipment
    • Incorrect calibration result
  • 10. Documentation
    • Loss of documents
    • Incorrect documentation
  • 11. Transportation
    • Transport accidents
    • Load shift
  • 12. Equipment Dismantling
    • Accidental damage
    • Injury during dismantling
  • 13. Equipment Storage
    • Equipment damage
    • Poor storage condition
  • 14. Review and Update Procedures
    • Outdated procedures
    • Overlooked hazards
  • 15. Follow-up Monitoring
    • Ineffective control measures
    • Unknown hazards

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Depth Check Measurements Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart