Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Decommissioning Of Paint Booth Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Unexpected start-up
- Chemical exposure
- 2. Disconnect Power Source
- Electric Shock
- Short circuits
- 3. Remove Spray Equipment
- Cutting Injuries
- Falling objects
- 4. Clean Booth Interior
- Chemical Exposure
- Inhalation risk
- 5. Disassembly of Exhaust System
- Dust and Debris Inhalation
- Cutting injuries
- 6. Dismantle Paint Mixing Station
- Splashing/Spillage Risk
- Fire hazard
- 7. Removal of Lighting Fixtures
- Fall from Height
- Electric Shock
- 8. Ceiling Tile Removal
- Falling objects
- Dust inhalation
- 9. Removal of Wall Panels
- Physical Strain
- Sharp edges
- 10. Collection and Disposal of Waste
- Chemical exposure
- Sharp object injury
- 11. Floor Cleaning
- Slip
- Trip & Fall
- Chemical exposure
- 12. Power Box Removal
- Electrical Shock
- Physical strain
- 13. Grounding Removal
- Electric Shock
- Fire Hazard
- 14. Removal of Ventilation Systems
- Fall from height
- Dust inhalation
- 15. Inspection and Sign-off
- Inadequate lighting
- Overlooking damage
- 16. Handover to Operations
- Insufficient Training or Knowledge
- Communication failure
- 17. Site clean-up
- Slip
- Trip & Fall
- Hazardous Waste