Dealing With Warehouse Fires Safe Work Method Statement (SWMS)

$96.80

The Dealing With Warehouse Fires Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Dealing With Warehouse Fires Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Dealing With Warehouse Fires Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Dealing With Warehouse Fires Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Dealing With Warehouse Fires Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Dealing With Warehouse Fires Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Dealing With Warehouse Fires Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • trips and falls
    • Inadequate emergency procedures
  • 2. Fire Safety Equipment Check
    • Malfunctioning equipment
    • Insufficient training
  • 3. Fire Drill Training
    • Physical injury during practice
    • Panic situations
  • 4. Material Handling
    • Mishandling flammable materials
    • Improper storage
  • 5. Emergency Exit Routes Awareness
    • Blocked evacuation routes
    • Poor lighting
  • 6. Fire Hazard Identification
    • Inaccurate hazard identification
    • Ignorance towards potential risks
  • 7. Smoke Inhalation Prevention
    • Smoke inhalation
    • Lack of ventilation
  • 8. Inspection for Potential Fire Risks
    • Overlooked fire threats
    • Negligence
  • 9. Maintenance of Fire Systems & Equipment
    • Faulty systems
    • Lack of regular maintenance
  • 10. Fire Safety Signage Verification
    • Poor visibility
    • Unfamiliarity with symbols
  • 11. Coordination with Local Fire Authority
    • Miscommunication
    • Delayed response time
  • 12. Regular Fire Audit & Compliance Review
    • Non-compliance
    • Outdated policies
  • 13. Building Evacuation Plan Creation
    • Inefficient plan
    • Confusion
  • 14. Awareness Programme on Fire Safety for Staff
    • Lack of knowledge
    • Complacency
  • 15. Response to Fire Alert
    • Panic
    • Delays in response
    • Missteps under pressure
  • 16. After Fire Activities
    • Potential flare-ups
    • Hazards in fire aftermath
  • 17. Post-Fire Risk Assessment
    • Incorrect assessment
    • Overlooked hazards
  • 18. Documentation & Reporting
    • Misreporting
    • Data loss
  • 19. Debriefings & Feedback sessions
    • Ignored feedback
    • Lack of discussion for improvements
  • 20. Review and improve procedures
    • Resistance to change
    • Ignored feedback

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Dealing With Warehouse Fires Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart