Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Cut Roof Opening Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Slip
- Trip
- Fall Hazards
- Material handling injuries
- 2. Tools & Equipment Check
- Electric Shock
- Cut and Laceration hazards
- 3. Setting up Scaffolding
- Falling from height
- Scaffold collapse
- 4. Roof Access
- Slip
- trip fall hazards
- Falling from height
- 5. Marking the Cut Area
- Misread measurements leading to structural instability
- Eye Strain
- 6. Initial Cut
- Dust inhalation
- Noise pollution
- Flying debris
- 7. Checking Stability
- Structural collapse
- Improper judgement
- 8. Full Cut Completion
- Cut and laceration hazards
- Falling material hazards
- 9. Removal of Cut Section
- Manual handling injuries
- falling materials
- 10. Installation of Support Beams
- Collapse of structure
- Manual handling injuries
- 11. Temporary Covering
- Weather damage exposure
- 12. Installation of New Roof Window
- Falling from height
- Failure of equipment/tools
- 13. Sealing & Waterproofing
- Chemical contact injury
- Incorrect application causing leaks
- 14. Final Inspection & Clearance
- Overlooking of flaws or risks
- Fatigue
- 15. Clean Up
- Trip and fall hazards
- manual handling injuries
- 16. Tool & Equipment Check
- Electric Shock
- Normal wear and tear not noticed
- 17. Final Reporting
- Missing data or incomplete report
- 18. Deconstructing Scaffolding
- Scaffold collapse
- Falling from height
- 19. Disposal of Waste Material
- Environmental pollution
- Manual Handling injuries
- 20. Wrap Up Review & Feedback
- Overlooking of minor incidents
- Not capturing learning points