Create Detailed Joinery Items Safe Work Method Statement (SWMS)

$96.80

The Create Detailed Joinery Items Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Create Detailed Joinery Items Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Create Detailed Joinery Items Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Create Detailed Joinery Items Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Create Detailed Joinery Items Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Create Detailed Joinery Items Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Create Detailed Joinery Items Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Exposed wiring
    • Improper tools
  • 2. Measuring Materials
    • Incorrect readings
    • Use of sharp objects
  • 3. Cutting Materials
    • Machine malfunction
    • Dust particles
  • 4. Joining Materials
    • Heavy lifting
    • Power tool misuse
  • 5. Sanding Materials
    • Noise pollution
    • Vibrations from tools
  • 6. Drilling Materials
    • Misalignment
    • Flying debris
  • 7. Shaping Materials
    • Machine error
    • Splinters
  • 8. Gluing Materials
    • Chemical hazards
    • Material slips
  • 9. Clamping Materials
    • Pinching hazard
    • Incorrect positioning
  • 10. Finishing Materials
    • Ventilation issues
    • Chemical misuse
  • 11. Checking Finished Product
    • Manual handling hazards
    • Eye strain
  • 12. Packing Products
    • Manual handling hazards
    • Slips
    • and trips
  • 13. Transporting Products
    • Manual handling hazards
    • Collision risks
  • 14. Cleaning Up
    • Slips and falls
    • Hazardous waste
  • 15. Equipment Maintenance
    • Electric shock
    • Cuts from sharp edges
  • 16. Storing Leftover Materials
    • Fire hazard
    • Tripping hazard
  • 17. Scheduling Next Project
    • Organisational stress
    • Fatigue
  • 18. Meeting with Client
    • Communication errors
    • Missed expectations
  • 19. Project Evaluation
    • Mental stress
    • Miscommunication
  • 20. Documentation and Reporting
    • Data errors
    • Seating posture issues

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Create Detailed Joinery Items Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart