Crane Operation Near Power Lines Risk Assessment

$79.50

The Crane Operation Near Power Lines Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Crane Operation Near Power Lines Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Crane Operation Near Power Lines Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Faulty equipment
    • inadequate training
  • 2. Site inspection
    • Inadequate light
    • uneven ground
  • 3. Pre-operation checks
    • Machinery damage
    • oil leak
  • 4. Crane Setup
    • Unstable surface
    • Insufficient setup space
  • 5. Lifting loads
    • Incorrectly slung load
    • overload
  • 6. Moving the Crane
    • Collision with objects
    • Overturning
  • 7. Operating near power lines
    • Electrocution
    • Equipment contact with power line
  • 8. Lowering loads
    • Dropped loads
    • Pinch points
  • 9. Dismantling the crane
    • Falling objects
    • Incorrect disassembly process
  • 10. Regular Maintenance and Inspections
    • Unexpected start
    • Electric shock
  • 11. Emergency Procedures
    • Inadequate emergency procedures
    • Lack of communication
  • 12. Housekeeping
    • Trips and falls
    • Poor hygiene
  • 13. Shift Changeover
    • Lack of awareness
    • Inadequate briefings
  • 14. End of Workday Procedures
    • Unsecured site
    • Equipment malfunctions overnight
  • 15. Documentation and Reporting
    • Data error
    • Inadequate recording
  • 16. Power Line Checks
    • High reaching cranes
    • Proximity to power lines
  • 17. Safety Briefings and Trainings
    • Incomplete information
    • Lack of understanding
  • 18. Load Verification
    • Overloading
    • Incorrect calculation of weight
  • 19. Safety Inspections
    • Non-compliance to safety standards
    • Faulty safety equipment
  • 20. End of Shift Checks
    • Incomplete checks
    • Unattended machinery
Shopping Cart