Correct Storage Of Glass Safe Work Method Statement (SWMS)

$96.80

The Correct Storage Of Glass Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Correct Storage Of Glass Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Correct Storage Of Glass Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Correct Storage Of Glass Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Correct Storage Of Glass Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Correct Storage Of Glass Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Correct Storage Of Glass Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate training
    • Incorrect handling and storage
  • 2. Unpacking pallets
    • Glass breakage
    • Slips
    • trips
    • and falls
  • 3. Handling glass sheets
    • Manual handling injuries
    • Cuts from sharp edges
  • 4. Loading onto trolleys/racks
    • Overloading
    • Awkward movement
  • 5. Relocating around site
    • Vehicle collision
    • Pedestrian incidents
  • 6. Unloading from trolleys/racks
    • Improper lifting
    • Falling objects
  • 7. Storage on racks
    • Falling objects
    • Poorly stacked items
  • 8. Retrieval from storage
    • Struck by falling object
    • Injury due to improper retrieval methods
  • 9. Transportation to work area
    • Hitting obstacles
    • Inclement weather
  • 10. Measurement and marking
    • Eye strain
    • Incorrect measurements
  • 11. Cutting procedures
    • Cuts
    • Eye injury from flying particles
  • 12. Discard of offcuts
    • Cuts
    • Trips over scattered material
  • 13. Clean up area
    • Tripping hazards
    • Laceration from cleaning broken glass
  • 14. Equipment check
    • Faulty equipment leading to accidents
  • 15. Reporting issues
    • Non-reporting of issues leading to accidents
  • 16. Post work sign off
    • Miscommunication
    • Errors in paperwork
  • 17. Storing leftover glass
    • Incorrect storage
    • Space utilisation
  • 18. Documentation and handover
    • Miscommunication
    • Absence of proper safety procedures
  • 19. Follow up inspection
    • Overlooking hazards
    • Inadequate training
  • 20. Final clean up
    • Slips
    • trips
    • and falls
    • Disposal of hazardous waste

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Correct Storage Of Glass Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart