Control Of Bio-Hazardous Substances (Bird Droppings, Etc) Safe Work Method Statement (SWMS)

$96.80

The Control Of Bio-Hazardous Substances (Bird Droppings, Etc) Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Control Of Bio-Hazardous Substances (Bird Droppings, Etc) Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Control Of Bio-Hazardous Substances (Bird Droppings, Etc) Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Control Of Bio-Hazardous Substances (Bird Droppings, Etc) Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Control Of Bio-Hazardous Substances (Bird Droppings, Etc) Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Control Of Bio-Hazardous Substances (Bird Droppings, Etc) Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Control Of Bio-Hazardous Substances (Bird Droppings, Etc) Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Exposure to bird droppings
    • injury from tools
  • 2. Loading tools onto vehicle
    • Slip and fall
    • loading accidents
  • 3. Travelling to job site
    • Vehicle accident
    • exposure to bio-hazardous substances
  • 4. Removing contaminated material
    • Exposure to bio-hazardous substances
    • inhaling dust particles
  • 5. Sealing off area
    • Lack of protective gear
    • not correctly applying the sealant
  • 6. Decontaminating area
    • Improper use of decontaminants
    • re-exposure to hazardous substances
  • 7. Sorting materials
    • Cutting or puncture injuries from sharp materials
    • exposure to hazardous substances
  • 8. Bagging waste
    • Exposure to hazardous biological material
    • heavy lifting injuries
  • 9. Disposal procedures
    • Improper disposal
    • contamination during transport
  • 10. Reporting and record-keeping
    • Incorrect information entered in records
  • 11. Cleaning tools
    • Exposure to hazardous chemicals in cleaners
    • repetitive motion injuries
  • 12. Doffing protective gear
    • Debris falling into eyes or onto skin while removing gear
    • improper cleaning
  • 13. Vehicle journey
    • Fatigue from long hours
    • potential for road accidents
  • 14. Unloading Tools
    • Handling injuries
    • tripping hazards
  • 15. Final Site Clean-up
    • Re-exposure to contaminants
    • disregard of safety procedures
  • 16. Completion and Follow up
    • Failure to comply with proper follow-up procedures
    • missed reporting
  • 17. Site Inspection
    • Human error
    • overlooked hazards
  • 18. Maintenance procedures
    • Tool malfunction
    • incorrect usage
  • 19. Training and Compliance
    • Non-compliance with training materials
    • misunderstanding of instructions
  • 20. Review and Performance Evaluation
    • Unresolved issues
    • ignored feedback

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Control Of Bio-Hazardous Substances (Bird Droppings, Etc) Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart