Construct Bunkers For Grain Storage Safe Work Method Statement (SWMS)

$96.80

The Construct Bunkers For Grain Storage Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Construct Bunkers For Grain Storage Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Construct Bunkers For Grain Storage Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Construct Bunkers For Grain Storage Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Construct Bunkers For Grain Storage Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Construct Bunkers For Grain Storage Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Construct Bunkers For Grain Storage Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Trips and falls
    • Inadequate safety equipment
  • 2. Site Inspection
    • Slips on uneven ground
    • Contact with harmful substances
  • 3. Equipment Setup
    • Crush injuries from machinery
    • Noise pollution
  • 4. Ground excavation
    • Falling objects
    • Unstable excavation walls
  • 5. Pour Footings
    • Contact with cement burns
    • Back injury from heavy lifting
  • 6. Building Formwork
    • Falls from height
    • Hand injuries from tools
  • 7. Install Reinforcement
    • Musculoskeletal disorders
    • Crush injuries
  • 8. Pour Concrete Walls
    • Chemical burns
    • Eye injuries from concrete dust
  • 9. Framing and Cladding
    • Falls from height
    • Cuts from sharp edges
  • 10. Install Doors
    • Finger entrapment
    • Falling objects
  • 11. Painting and Finishing
    • Exposure to harmful fumes
    • Eye irritation
  • 12. Electrical Installation
    • Electrical shocks
    • Fires
  • 13. Plumbing Installation
    • Water damage
    • Workspace contamination
  • 14. Clean Up
    • Tripping over debris
    • Exposure to dust
  • 15. Final Inspection
    • Missed hazards
    • Remaining debris
  • 16. Reporting
    • Poor communication
    • Errors in documentation
  • 17. Routine Maintenance
    • Unidentified hazards & Faulty machinery
  • 18. Emergency Procedures
    • Panic
    • Lack of knowledge
  • 19. Training and Supervision
    • Inadequate training
    • Poor supervision
  • 20. Hazard Identification
    • Incomplete hazard identification
    • Miscommunication

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Construct Bunkers For Grain Storage Safe Work Method Statement (SWMS) references: