Conduit Installation Safe Work Method Statement (SWMS)

$96.80

The Conduit Installation Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Conduit Installation Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Conduit Installation Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Conduit Installation Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Conduit Installation Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Conduit Installation Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Conduit Installation Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate training
    • incorrect tools
  • 2. Inspection of site
    • Slips
    • falls
    • trip hazards
    • contact with electricity
  • 3. Marking the Conduit Pathway
    • Trips
    • physical exertion
    • falling objects
  • 4. Cutting the Conduit
    • Cuts
    • noise
    • dust
    • flying particles
  • 5. Bending the conduit
    • Physical strain
    • poor ergonomics
  • 6. Attaching the Conduit
    • Falling from heights
    • contact with electricity
  • 7. Running Electrical Wire
    • Electric shock
    • burns
  • 8. Securing Wire in the Conduit
    • Finger injury
    • slips
    • trips
  • 9. Attach Terminal Ends
    • Electrical Shock
    • burns
  • 10. Testing the installation
    • Electrocution
    • equipment failure
  • 11. Cleaning the Workspace
    • Trips
    • hazardous substances
  • 12. Disposal of waste materials
    • Chemical exposure
    • trip hazard from scattered materials
  • 13. Repair and maintenance
    • Contact with electricity
    • falling from height
  • 14. Final inspection of installation
    • Inadequate lighting
    • unnoticed loose part
  • 15. Documentation & Reporting
    • Data security breach
    • misuse of information

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Conduit Installation Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart