Conduct Routine Inspections Safe Work Method Statement (SWMS)

$96.80

The Conduct Routine Inspections Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Conduct Routine Inspections Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Conduct Routine Inspections Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Conduct Routine Inspections Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Conduct Routine Inspections Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Conduct Routine Inspections Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Conduct Routine Inspections Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Trips
    • slipping hazards
    • electrical hazards
  • 2. Inspecting equipment
    • Defective equipment
    • noise
  • 3. Document inspection findings
    • Ergonomic hazards
    • psychological stress
  • 4. Navigating to inspection site
    • Traffic
    • slips
    • trips and falls
  • 5. Ascending/Descending Structures
    • Falls from height
    • losing balance
  • 6. Checking safety devices
    • Device malfunction
    • inadequate maintenance
  • 7. Inspecting for cleanliness
    • Exposure to hazardous substances
    • biological infection
  • 8. Reporting and communication
    • Miscommunication
    • lack of knowledge
  • 9. Inspecting electrical components
    • Electrical shocks
    • explosions
  • 10. Using handheld tools
    • Hand injury
    • tool malfunction
  • 11. Moving heavy objects
    • Physical strain
    • back injuries
  • 12. Working in confined spaces
    • Insufficient oxygen
    • entrapment
  • 13. Performing visual inspections
    • Eye Strain
    • physical strain
  • 14. Handling machinery
    • Pinch points
    • caught in/between machine parts
  • 15. Post-inspection follow-up activities
    • Paperwork mistakes
    • data misinterpretation
  • 16. Calibration of measuring equipment
    • Inaccurate measurement
    • misuse of calibration devices
  • 17. Testing systems for functionality
    • System failure
    • electrical hazards
  • 18. Inspecting environmental conditions
    • Exposure to weather elements
    • bio-hazards
  • 19. Monitor and Maintain equipment
    • Breakdowns
    • improper use of tools
  • 20. Conducting Final Assessment
    • Incomplete inspection
    • errors in reporting

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Conduct Routine Inspections Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart