Conduct Regular Maintenance Safe Work Method Statement (SWMS)

$96.80

The Conduct Regular Maintenance Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Conduct Regular Maintenance Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Conduct Regular Maintenance Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Conduct Regular Maintenance Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Conduct Regular Maintenance Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Conduct Regular Maintenance Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Conduct Regular Maintenance Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Miscommunication
    • Inadequate tools and materials
  • 2. Set up Equipment
    • Electric shock
    • Unexpected equipment movement
  • 3. Inspect Tools
    • Faulty tools
    • Incorrect use of tools
  • 4. Perform Maintenance Task
    • Physical harm from machine
    • Noise-induced hearing loss
  • 5. Clean Up Post-Maintenance
    • Trips and falls from debris or spills
    • Contact with harmful substances
  • 6. Documenting the process
    • Mental stress
    • eye strain from poor lighting.
  • 7. Machine testing
    • Machine malfunction
    • Electric shock
  • 8. Review safety procedures
    • Misunderstanding instructions
    • Poor implementation
  • 9. Report Issues/Incidents
    • Mental stress
    • Miscommunication
  • 10. Training for next maintenance
    • Inadequate training
    • Miscommunication
  • 11. Replace Faulty Parts
    • Injury from sharp or heavy objects
    • Improper disposal of parts
  • 12. Secure Work Area
    • Trips and falls
    • Hazardous materials exposure
  • 13. Equipment Shutdown
    • Rushing to shutdown
    • Last minute fixes
  • 14. Audit maintenance
    • Misinterpretation of results
    • Overlooking small errors
  • 15. Monitor Performance post-maintenance
    • Machine malfunction
    • overworking
  • 16. Discuss Next Plan of Action
    • Miscommunication
    • Mental stress
  • 17. Feedback and Improvements
    • Resistance to change
    • Fear of feedback
  • 18. Schedule Next Maintenance
    • Miscommunication
    • Scheduling conflict
  • 19. Sign off Procedure
    • Miscommunication
    • Documentation error
  • 20. Adjornment
    • Unmonitored risks post-adjournment
    • Residual hazards

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Conduct Regular Maintenance Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart