Collecting Litter And Rubbish Safe Work Method Statement (SWMS)

$96.80

The Collecting Litter And Rubbish Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Collecting Litter And Rubbish Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Collecting Litter And Rubbish Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Collecting Litter And Rubbish Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Collecting Litter And Rubbish Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Collecting Litter And Rubbish Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Collecting Litter And Rubbish Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping over discarded items
    • exposure to harmful substances
  • 2. Gather safety equipment
    • Incorrect use of equipment
    • lack of appropriate equipment
  • 3. Pre work inspection
    • Overlooking dangerous objects
    • missing hazardous areas
  • 4. Equipment set up
    • Improper assembly leading to injury
    • faulty equipment
  • 5. Starting collection
    • Risk of sharp objects
    • improper lifting techniques
  • 6. Collection procedure
    • Exposure to biohazardous materials
    • repetitive strain injuries
  • 7. Handling recyclables
    • Exposure to potential health hazards from dirty recyclables
    • cuts from sharp objects
  • 8. Handling general waste
    • Exposure to potentially harmful substances
    • risk of infection
  • 9. Disposal of collected rubbish
    • Mishandling
    • incorrect disposal risking environmental harm
  • 10. Clean up after litter pick
    • Potential for overlooked hazards
    • improper disposal of used gloves
  • 11. Sanitising equipment
    • Chemical risks from cleaning products
    • potential for overlooked hazards
  • 12. Storing equipment
    • Misplacement leading to tripping
    • inappropriate storage causing damage
  • 13. Dealing with incidents
    • Lack of preparedness may heighten risk
  • 14. End of day evaluation
    • Inadequate reflection could lead to repetition of mistakes
  • 15. Maintenance of equipment
    • Incorrect practices could lead to equipment failure and accidental injury
  • 16. Review and modify procedures
    • Inability to recognise or admission of flaws could lead to repeated hazards

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Collecting Litter And Rubbish Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart