Clearance Of Vegetation Near Dams And Other Water Storage Facilities. Safe Work Method Statement (SWMS)

$96.80

The Clearance Of Vegetation Near Dams And Other Water Storage Facilities. Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Clearance Of Vegetation Near Dams And Other Water Storage Facilities. Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Clearance Of Vegetation Near Dams And Other Water Storage Facilities. Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Clearance Of Vegetation Near Dams And Other Water Storage Facilities. Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Clearance Of Vegetation Near Dams And Other Water Storage Facilities. Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Clearance Of Vegetation Near Dams And Other Water Storage Facilities. Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Clearance Of Vegetation Near Dams And Other Water Storage Facilities. Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Uneven ground
    • risky weather conditions
    • poorly maintained equipment.
  • 2. Equipment Check
    • Equipment malfunction
    • lack of personal protective gear.
  • 3. Area Marking
    • Tripping hazards
    • incorrect marking.
  • 4. Vegetation identification
    • Incorrect identification
    • exposure to poisonous vegetation.
  • 5. Vegetation Clearance
    • Risk of falling objects
    • back injuries
    • cuts or abrasions
    • disturbance of wildlife habitat.
  • 6. Use of chainsaws
    • Kickback
    • chainsaw contact
    • noise danger
    • slips and falls.
  • 7. Use of hand tools (axes, loppers etc.)
    • Strain injuries
    • cuts and punctures
    • tool malfunction.
  • 8. Handling of Cut Vegetation
    • Manual handling injuries (strain/sprain)
    • slip on vegetation debris.
  • 9. Transport of cut vegetation
    • Transport vehicle accident
    • load securement failure.
  • 10. Disposal of vegetation
    • Fire hazards
    • injurious waste
    • trip hazards.
  • 11. Checking for regrowth
    • Slips
    • trips
    • falls
    • undetected regrowth.
  • 12. Update site records
    • Loss of data
    • unrecorded risks.
  • 13. Equipment Decontamination
    • Chemical hazards
    • biological hazards from contaminated equipment.
  • 14. Review of work area post-clearance
    • Remaining dangers; unremoved vegetation
    • nesting of animals or insects.
  • 15. Communication of completion
    • Miscommunication leading to further hazards.

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Clearance Of Vegetation Near Dams And Other Water Storage Facilities. Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart