Electric Welding Arc MIG TIG and Spot Welding SWMS

This SWMS covers preparation, area controls, equipment setup, welding, post-weld treatment and clean-up for arc, MIG, TIG and spot welding.
Activities covered include
- Plan the welding work
- Check personal protective equipment and screens
- Conduct post-weld treatment, clean up and sign off
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This SWMS covers preparation, area controls, equipment setup, welding, post-weld treatment and clean-up for arc, MIG, TIG and spot welding. It supports work planning and risk management for electrical energy, arc radiation, fumes, fire, gas cylinders, hot materials and moving equipment.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the welding work
- Establish the welding area
- Control fire and explosion hazards
- Inspect electrical equipment
- Set up gas cylinders
- Set ventilation controls
- Check personal protective equipment and screens
- Position workpieces safely
- Perform manual arc welding
- Operate TIG and MIG equipment
- Operate resistance welders and robot welding cells
- Conduct post-weld treatment, clean up and sign off
Who is this for?
For contractors, workers, supervisors and businesses carrying out electric welding activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan welding work |
|
| Establish welding area |
|
| Control fire and explosion |
|
| Inspect electrical equipment |
|
| Set up gas cylinders |
|
| Set ventilation controls |
|
| Check PPE and screens |
|
| Position workpieces safely |
|
| Perform manual arc welding |
|
| Operate TIG and MIG equipment |
|
| Operate resistance welders |
|
| Operate robot welding cells |
|
| Conduct post-weld treatment |
|
| Clean up and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: Welding processes, including risk management for fumes, radiation, electrical risks, fire, heat, gases, ventilation and PPE.
- Model Code of Practice: Managing risks of hazardous chemicals in the workplace.
- Model Code of Practice: Managing electrical risks in the workplace.
- Model Code of Practice: How to manage work health and safety risks.
- Model Code of Practice: Confined spaces, where applicable.
- AS 1674.1 Safety in welding and allied processes—Fire precautions.
- AS/NZS 60974 series Arc welding equipment.
- AS/NZS 3957 Light-transmitting screens and curtains for welding operations.
- AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment; AS/NZS 1716 Respiratory protective devices.
- AS/NZS 1337.1 Eye and face protection; AS/NZS 2161 series Occupational protective gloves; AS/NZS 2210.3 Safety footwear; AS/NZS 1270 Hearing protectors.
- AS 4332 The storage and handling of gases in cylinders.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes free branding + 2 years of free updates
$79.50
$96.80
Free branding + 2 years of updates