Clean Rooftops Safe Work Method Statement (SWMS)

$96.80

The Clean Rooftops Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Clean Rooftops Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Clean Rooftops Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Clean Rooftops Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Clean Rooftops Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Clean Rooftops Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Clean Rooftops Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping over equipment
    • Exposure to weather elements
  • 2. Access Rooftop
    • Fall from heights
    • Slippery surfaces
  • 3. Check Rooftop Condition
    • Falls through skylights
    • Structural instability
  • 4. Set Up Cleaning Equipment
    • Machinery malfunction
    • Electrocution
  • 5. Begin Cleaning
    • Exposure to chemicals
    • Slips and falls
  • 6. Debris Removal
    • Injuries from sharp objects
    • Heavy lifting
  • 7. Wash Rooftop
    • Water damage
    • Slips on wet surface
  • 8. Inspect for Damage
    • Missed spots
    • Inadequate cleaning
  • 9. Apply Protective Coating
    • Exposure to harmful substances
    • Slipping
  • 10. Clean Up
    • Tripping over equipment
    • Disposal of harmful materials
  • 11. Document Work
    • Paper cuts
    • Misplacement of documents
  • 12. Descend from Rooftop
    • Fall from heights
    • Slipping
  • 13. Pack Away Equipment
    • Machinery malfunction
    • Tripping over equipment
  • 14. Review And Reporting
    • Miscommunication
    • Lost data
  • 15. Debriefing
    • Unattended tools
    • unrecorded damage,
  • 16. Prepare for next job
    • Heavy lifting
    • machinery faults
  • 17. Final checks
    • Fall from heights
    • undetected damage
  • 18. Secure Work site
    • Unattended tools
    • unsecured ladders
  • 19. Disposal of waste materials
    • Exposure to hazardous substances
    • improper disposal
  • 20. Leave job site
    • Traffic hazards
    • trip hazards

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Clean Rooftops Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart