Clean Manufacturing Equipment Safe Work Method Statement (SWMS)

$96.80

The Clean Manufacturing Equipment Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Clean Manufacturing Equipment Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Clean Manufacturing Equipment Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Clean Manufacturing Equipment Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Clean Manufacturing Equipment Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Clean Manufacturing Equipment Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Clean Manufacturing Equipment Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Manual handling injuries
    • Hazardous substances exposure
  • 2. Shut down Equipment
    • Electric shock
    • Cut injuries from sharp edges
  • 3. Isolate Equipment
    • Electrical hazards
    • Moving machinery parts
  • 4. Setup Cleaning Equipments
    • Chemical burns
    • Slips and trips from spillages
  • 5. Clean Outer Surfaces
    • Skin irritations from cleaning chemicals
    • Fall from height (For tall machines)
  • 6. Dismantle Necessary Parts
    • Sharp object injuries
    • Heavy lifting injuries
  • 7. Clean Inner Surfaces
    • Eye injuries from abrasive particles
    • Inhalation of dangerous fumes
  • 8. Dispose of Cleaning Wastes
    • Environmental damage
    • Infection from contaminated wastes
  • 9. Reassemble Equipment
    • Entrapment injuries
    • Working at height (for tall machines)
  • 10. Test Equipment
    • Noise pollution
    • Electric Shock
  • 11. Evaluate Cleaning Process
    • Cuts from sharp objects
    • Slip and fall due to residual wet surface
  • 12. Document Results
    • Eye strain from long hours of computer use
    • Repetitive stress injuries
  • 13. Store Cleaning Equipment
    • Trip over stored equipment
    • Unsafe storage conditions
  • 14. Debrief Team
    • No Physical Hazards in this Step
  • 15. Regular Maintenance Check
    • Hazardous fumes during inspection
    • Unexpected start-up of equipment
  • 16. Equipment Defect Escalation
    • Injury due to defective equipment
    • Fire hazards due to short-circuit
  • 17. Update Cleaning Protocol
    • Repetitive-motion injuries
    • Eye strain from computer use
  • 18. Health and Safety Training
    • Misinformation can lead to unsafe practices
  • 19. Operate Equipment
    • Entanglement in moving machinery parts
    • Electric shock
  • 20. End of Shift Wrap-up
    • Fatigue related accidents
    • Inadequate lock out/tag out procedures during shift change

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Clean Manufacturing Equipment Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart