Clean Gutters Safe Work Method Statement (SWMS)

$96.80

The Clean Gutters Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Clean Gutters Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:
Safe Work Method Statement Template for Clean Gutters

If you’re in the business of cleaning gutters and ensuring homes and commercial properties are safe from build-up and blockages, you need a solid plan to keep yourself and your team protected. Our Safe Work Method Statement (SWMS) Template for Clean Gutters is designed with the unique needs of tradespeople in mind. Check out its key features below:

  • Pre-filled and Comprehensive: Save time with our pre-filled sections, tailored specifically for gutter cleaning tasks. It covers various scenarios so you can focus less on paperwork and more on the job.
  • Fully Editable and Customisable: Provided in Microsoft Word format, this template is fully editable. Modify it easily to fit the specific needs of your project. Add or remove details as required without any fuss.
  • Includes the Scope of the Project and the Project Details: The template comes with sections to clearly define the scope of work and detailed project information. This ensures everyone involved understands the responsibilities and the extent of works required.
  • Includes Checklist of Any High-Risk Machinery on Site: Identify and list any high-risk machinery that might be on site. This checklist helps you assess all potential hazards, contributing to a safer working environment.
  • Includes Space for Recording Any Staff Training: Documenting training sessions is crucial. The template provides designated areas to note down any staff training, ensuring all team members are equipped with the necessary skills and knowledge.
  • Includes Before and After Risk Ratings: Evaluate the risks before starting the job and after implementing safety measures. This two-stage risk rating system helps monitor improvements and ensure ongoing safety.
  • Includes Resources for Use of Legislative References: Stay compliant with Australian laws. The template includes resources and references to relevant legislation so you can make informed decisions and keep within legal requirements.
  • Includes All PPE Required: A dedicated section outlines all the Personal Protective Equipment (PPE) needed for the task. This ensures everyone knows what’s required to stay safe while working.
  • Includes Risk Assessment and Risk Assessment Matrix: Conduct thorough risk assessments using the provided matrix. This tool helps pinpoint potential risks and develop strategies to mitigate them effectively.
  • Includes a Checklist to Ensure All Requirements Have Been Covered When Implementing the SWMS: This handy checklist makes sure you’ve covered all bases when setting up your SWMS. Nothing gets overlooked, giving an additional layer of security.
  • Includes Sign Off Page for All Workers and Responsible Persons: Accountability is key. The sign-off page ensures that every worker and responsible person acknowledges and agrees to the SWMS, promoting a culture of responsibility.
  • Easy to Use, Easy to Customise: User-friendly design means you don’t have to be a computer whiz to use or customise this template. Straightforward instructions and layout make it easy for anyone to pick up and apply.
  • Suitable for Large Contracts and Tenders, Including Tier 1 Contractual Work: Ideal for both small jobs and larger contracts, including top-tier contractual work. Its comprehensive nature meets the demanding standards of significant projects.
  • Quick Delivery by Email: No waiting around. As soon as you order, we send the template straight to your inbox. Get started right away without unnecessary delays.

The SWMS Template for Clean Gutters offers a useful framework to help manage risks and put safety first, whether you’re tackling a residential job or a major commercial contract. Adaptable and thorough, it equips you with the tools needed to maintain a secure worksite and fulfil your duties responsibly.


The Clean Gutters Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Miscommunication
    • inadequate equipment
  • 2. Site Inspection
    • Uneven ground
    • hidden obstacles
  • 3. Set Up Ladders
    • Ladder instability
    • overreaching
  • 4. Secure Area
    • Unauthorized access
    • trip hazards
  • 5. Use PPE
    • Incorrect PPE usage
    • PPE failure
  • 6. Ascend Ladder
    • Falls from height
    • slipping
  • 7. Clean Debris
    • Sharp objects
    • heavy lifting
  • 8. Bag Waste
    • Puncture wounds
    • chemical exposure
  • 9. Descend Ladder
    • Falls from height
    • fatigue
  • 10. Move Ladder
    • Ladder collision
    • muscle strain
  • 11. Inspect Gutter
    • Bacterial exposure
    • structural weakness
  • 12. Flush System
    • Water pressure
    • electrical hazards
  • 13. Check Downpipes
    • Blockages
    • trapped pests
  • 14. Final Cleaning
    • Chemical use
    • slippery surfaces
  • 15. Dismantle Setup
    • Falling equipment
    • missing parts
  • 16. Dispose Waste
    • Improper waste handling
    • contamination
  • 17. Review Work
    • Overlooked hazards
    • incomplete tasks
  • 18. Pack Equipment
    • Equipment damage
    • improper storage
  • 19. Site Check
    • Residual waste
    • missed hazards
  • 20. Leave Site
    • Left behind tools
    • unreported issues

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Clean Gutters Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart