Checking Expiry Date Of Harness And Lanyard Safe Work Method Statement (SWMS)

$96.80

The Checking Expiry Date Of Harness And Lanyard Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Checking Expiry Date Of Harness And Lanyard Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Checking Expiry Date Of Harness And Lanyard Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Checking Expiry Date Of Harness And Lanyard Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Checking Expiry Date Of Harness And Lanyard Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Checking Expiry Date Of Harness And Lanyard Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Checking Expiry Date Of Harness And Lanyard Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect or inadequate equipment
    • Lack of training
  • 2. Inspect Harness and Lanyard
    • Defective equipment
    • Improper usage
  • 3. Check Expiry Date
    • Expired harness
    • Failure to notice expiry date
  • 4. Clean Equipment
    • Chemical exposure
    • Slips
    • trips
    • and falls
  • 5. Test Harness and Lanyard
    • Failure during test
    • Misinterpretation of results
  • 6. Repair/Replace as Needed
    • Inadequate repair
    • Use of defective parts
  • 7. Document Results
    • Miscommunication
    • Lost paperwork
  • 8. Store Equipment
    • Improper storage conditions
    • Access issues
  • 9. Report Any Issues
    • Unreported hazards
    • Communication breakdown
  • 10. Retrain Staff as Necessary
    • Lack of understanding
    • Inadequate training resources
  • 11. Periodic Auditing
    • Skipping audits
    • Failing to record findings
  • 12. Maintain Records
    • Lost documents
    • Unauthorized access
  • 13. Ongoing Monitoring
    • Insufficient monitoring
    • Lack of reporting
  • 14. Review Safety Procedures
    • Outdated procedures
    • Non-compliance
  • 15. Implement Changes
    • Resistance to change
    • Poor implementation methods
  • 16. Recertification Process
    • Missing certification
    • Inadequate recertification training
  • 17. Emergency Preparedness
    • Non-compliance to safety regulations
    • Lack of emergency plan
  • 18. Regular Equipment checks
    • Slips
    • trips
    • and falls
    • Damages to equipment
  • 19. Regular Maintenance
    • Inadequate maintenance
    • Missed maintenance schedule
  • 20. Re-inspect Harness and Lanyard
    • Risk of re-use of defective products
    • Misinterpretation of results

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Checking Expiry Date Of Harness And Lanyard Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart