Ceramic Tiling Safe Work Method Statement (SWMS)

$96.80

The Ceramic Tiling Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Ceramic Tiling Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Ceramic Tiling Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Ceramic Tiling Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Ceramic Tiling Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Ceramic Tiling Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Ceramic Tiling Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping over materials
    • Exposure to hazardous substances
  • 2. Tile layout planning
    • Incorrect measurements causing issues
    • Use of sharp objects
  • 3. Surface preparation
    • Disruption of dust and debris
    • Use of electric tools
  • 4. Mixing adhesive
    • Chemical exposure
    • Skin irritations
  • 5. Applying adhesive
    • Contact with skin or eyes
    • Ingestion of adhesive
  • 6. Setting Tiles
    • Cut by sharp tiles
    • Musculoskeletal Injury due to repetitive motion
  • 7. Cutting Tiles
    • Noise hazard
    • Risk of cuts from blade
  • 8. Grouting
    • Exposure to chemicals
    • Inhalation of sand particles
  • 9. Tile Cleaning
    • Slips due to wet surface
    • Chemical exposure during cleaning
  • 10. Sealing Tiles
    • Vapour inhalation
    • Contact with skin or eyes
  • 11. Inspection & Finishing
    • Falls from height if inspecting upper areas
    • Eye strain
  • 12. Cleaning work site
    • Trip hazards
    • Improper waste disposal
  • 13. Transporting Tools/Equipment
    • Heavy lifting injuries
    • Trip hazards
  • 14. Equipment maintenance
    • Electrical faults causing shock
    • Fires due to poor maintenance
  • 15. Emergency procedures
    • Not following correct procedures
    • Panic causing accidents
  • 16. Storage of Materials
    • Incorrect storage leading to falling objects
    • Fire hazards due to flammable materials
  • 17. Handling of scrap material
    • Cuts and scrapes
    • Improper disposal
  • 18. Electricity Safety
    • Electrocution
    • Fire from faulty wires
  • 19. Use of extension ladders
    • Slips and falls
    • Incorrect usage leading to injury
  • 20. Training & Supervision
    • Unqualified personnel working
    • Lack of proper supervision causing accidents

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Ceramic Tiling Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart