Cave Diving Safe Work Method Statement (SWMS)

$96.80

The Cave Diving Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Cave Diving Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Cave Diving Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Cave Diving Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Cave Diving Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Cave Diving Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Cave Diving Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect Equipment
    • Lack of Training
  • 2. Dive Briefing
    • Miscommunication
    • Knowledge Deficit
  • 3. Equipment Check
    • Equipment Failure
    • Inadequate Inspection
  • 4. Entry to Water
    • Slips
    • Trips and Falls
    • Bad Weather Conditions
  • 5. Navigation Underwater
    • Poor Visibility
    • Getting Lost
  • 6. Underwater Work
    • Decompression Sickness
    • Hypothermia
  • 7. Ascent
    • Rapid Ascent
    • Decompression Sickness
  • 8. Exit from Water
    • Strong Currents
    • Slips
    • Trips and Falls
  • 9. Debriefing
    • Miscommunication
    • Lack of Reporting
  • 10. Cleaning Equipment
    • Chemical Exposure
    • Equipment Damage
  • 11. Equipment Storage
    • Damage to Equipment
    • Incorrect Storage Practices
  • 12. Paperwork & Documentation
    • Missed Entries
    • Miscommunication
  • 13. Emergency Procedures Training
    • Incomplete Training
    • Fear/Anxiety Response
  • 14. Regular Drills & Practice Dives
    • Insufficient Experience
    • Potential for Incidents
  • 15. Routine Equipment Maintenance & Inspections
    • Inspectors Lacking Training
    • Missed Issues or Failures
  • 16. Communication Checks
    • Ineffective Communication Devices
    • Messages not Sent/Received
  • 17. Contingency Planning
    • Inadequate Planning for Variations
    • Failures or Emergency Situations
  • 18. Logistics & Travel to/from Dive Site
    • Transport Accidents
    • Loss or Damage to Equipment
  • 19. General Health & Fitness Checks
    • Divers with existing Medical Conditions
    • in a Poor State of Health/Fitness
  • 20. Environmental Impact Assessments
    • Damage to Flora/Fauna of Cave Environments
    • Pollution from Team Members and Equipment

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Cave Diving Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart