Casting Shakeout, Fettling, And Cleaning Safe Work Method Statement (SWMS)

$96.80

The Casting Shakeout, Fettling, And Cleaning Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Casting Shakeout, Fettling, And Cleaning Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Casting Shakeout, Fettling, And Cleaning Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Casting Shakeout, Fettling, And Cleaning Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Casting Shakeout, Fettling, And Cleaning Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Casting Shakeout, Fettling, And Cleaning Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Casting Shakeout, Fettling, And Cleaning Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slipping
    • tripping hazards
    • Improper equipment use
  • 2. Moulding Process
    • Burn from hot materials
    • Inhalation of dust
  • 3. Adding Coating
    • Exposure to harmful substances
    • Skin or eye irritation
  • 4. Core Making
    • Small particle inhalation
    • Machine-related injuries
  • 5. Pattern Removal
    • Injuries from sharp objects
    • Slipping
  • 6. Closing Mould
    • Heavy lifting
    • Crush injuries
  • 7. Pouring Molton Metal
    • Burns from molten metal
    • Spillage
  • 8. Cooling Period
    • Excessive heat exposure
    • Physical contact with still-hot metal
  • 9. Shakeout Process
    • Open flame hazard
    • Vibrations leading to equipment failure
  • 10. Fettling Process
    • Dust exposure
    • Noise pollution
  • 11. Cleaning Process
    • Exposure to chemicals
    • Eye irritation
  • 12. Quality Check
    • Repetitive motion injury
    • Inaccurate measurements risking product integrity
  • 13. Packaging
    • Material handling injuries
    • Repetitive strain injuries
  • 14. Dispatch
    • Forklift accidents
    • Load shifting
  • 15. Waste Disposal
    • Exposure to waste material
    • Infectious materials
  • 16. Equipment Maintenance
    • Electric shocks
    • Inadequate lockout/tagout procedures
  • 17. End of Shift Clean Up
    • Slips
    • trips and falls
    • Chemical exposure
  • 18. Reviewing Work Process
    • Missed hazard recognition
    • Failure to address potential risks
  • 19. Safety Checks
    • Inadequate safety equipment
    • Unseen hazards during checks
  • 20. Emergency Procedures Practise
    • Panic during emergency
    • Inadequate evacuation practise

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Casting Shakeout, Fettling, And Cleaning Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart