Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Business Security Surveys Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Cluttered workspace
- inadequate lighting
- 2. Survey Planning and Design
- Lack of trained personnel
- insufficient data
- 3. Equipment Testing and Synopsis
- Faulty equipment
- electrical hazards
- 4. Staff Briefing
- Unclear instructions
- communication failure
- 5. Travel to Site
- Traffic accidents
- vehicle breakdown
- 6. Arrival at Site
- Physical hazards
- unfamiliar environment
- 7. Site Setup
- Incorrect setup
- manual handling injuries
- 8. Conducting the Survey
- Data security threats
- staff safety issues
- 9. Site Communication
- Poor communication equipment
- information misinterpretation
- 10. Recording and Reporting Findings
- State-level bureaucratic requirements
- record keeping errors
- 11. Leaving the Site
- Theft or loss of equipment
- disturbances to local residents
- 12. Travelling Back
- Traffic accidents
- vehicle problems
- 13. Post-Survey Review
- Missed hazardous observations
- incorrect reporting
- 14. Data Analysis
- Invalid method
- wrong conclusions
- 15. Report Writing and Submission
- Incorrect formatting
- information mishandling
- 16. Follow Up
- Inadequate follow-up plan
- miscommunications with stakeholders
- 17. Outcome Evaluation
- Misjudgement of outcomes
- insufficient feedback processes
- 18. Future Planning
- Lack of foresight
- inappropriate plans for future surveys
- 19. Process and System Review
- No regular updating process
- failure to implement improvements
- 20. Finalisation of Survey Project
- Delayed project completion
- unsatisfactory results